Reading architectural drawings starts with the title block and the drawing list, so you know which sheet you are holding and at what scale, and only then moves on to grid lines, dimension strings, levels, line types and material hatches. Beginners tend to look straight at the picture and guess, so they confuse hidden lines with visible ones, misread the scale or measure the print with a ruler instead of reading the figures. This lesson covers the basic architectural drawing conventions used in Vietnam and walks you through reading a 5 × 20 m townhouse set in the right order, with an example where every dimension string and level adds up.
By the end of this lesson, you will be able to:
- Read the title block and drawing list and know the usual sheet order of a townhouse architectural set.
- Convert between drawing and real dimensions at 1:100, 1:50 and 1:20 and choose a suitable paper size.
- Tell thick continuous, thin continuous, dashed and chain lines apart and know what each one shows.
- Read grid lines, three-tier dimension strings and ±0.000 levels on plans and sections.
- Check whether dimension strings and levels add up to the totals.
Just starting out as an architectural drafter? Drawing conventions and reading sets are step 1 of the roadmap, before AutoCAD, plans, elevations and sections, details and Revit. See the 8-step architectural drafter roadmap to learn in the right order.
Why a drafter must read drawings fluently before drawing
Architectural drawings are the shared language of architects, structural engineers, builders and owners. A drafter is the person who "writes" that language: if you cannot read it fluently, you will produce sheets that look fine on screen but that site crews misunderstand.
Who reads your drawings
- The lead architect: checks the design intent and office conventions.
- Structural and MEP engineers: take grids, levels and dimensions for their own work.
- Site crews: measure, set out lines and pour concrete from the figures on the drawing.
- Owners and permitting authorities: look at function, areas and heights.
Conventions mean nobody has to guess
Every line and symbol on a drawing has an agreed meaning. Vietnam has a set of TCVN national standards for construction drawings (paper sizes, scales, line types, symbols, dimensioning), largely compatible with ISO standards; on top of that every office has its own "house standard" (templates, layers, title blocks). When you join a new office, the first thing to ask for is the house standard and a completed sample set.
Paper sizes, scales and converting dimensions
The scale tells you how many real units one unit on paper represents. At 1:100, 1 mm on paper equals 100 mm in reality, so 1 cm on paper is 1 m on site.
Common paper sizes
Drawings use the A series: A0 (841 × 1189 mm), A1 (594 × 841), A2 (420 × 594), A3 (297 × 420), A4 (210 × 297). Townhouse sets are often printed on A3 to carry around site and on A1 for presentation. Each size is exactly half of the next size up.
Scales by drawing type
| Drawing type | Typical scales | 1 cm on paper equals |
|---|---|---|
| Site plan, location plan | 1:500, 1:200 | 5 m; 2 m |
| Townhouse plans, elevations, sections | 1:100, 1:50 | 1 m; 0.5 m |
| Stair, bathroom and door details | 1:20, 1:10 | 20 cm; 10 cm |
| Small construction details (trims, joints) | 1:5, 1:2 | 5 cm; 2 cm |
A scale rule (Figure 1) has different scales printed along its edges so you can read dimensions on a print quickly. Each sheet states its scale in the title block; if one sheet holds several drawings at different scales, the scale is written under each drawing's title.
Read the figures, do not measure the print
Prints can stretch or be printed "fit to page", which breaks the scale. The professional rule: the dimension to build from is the figure written on the dimension line; a scale rule is only for quick estimates. When the figure and the drawing disagree, ask the lead designer rather than picking one yourself.
Line types: what each one tells you
In architectural drawings, line weight and line type tell you whether something is cut, seen beyond or hidden. Misread the lines and you misread the whole drawing.
Basic line types
| Line type | Used for | Example on a floor plan |
|---|---|---|
| Thick continuous | Outlines of elements cut by the section plane | Walls and columns cut at about 1 m height |
| Thin continuous | Visible edges beyond the cut, dimension lines, extension lines, hatching | Stair treads below, sanitary fittings, floor tiles |
| Dashed | Hidden edges, elements above the cut plane | Beams, the edge of the floor above, wall cabinets |
| Thin chain (dash-dot) | Grid lines, centre lines, axes of symmetry | Grids 1, 2, 3 and A, B, C |
| Wavy or zigzag | Break lines, limits of a partial view | Shortening a long wall |
Line weights when plotting
Line widths are usually chosen from a fixed series (for example 0.18, 0.25, 0.35, 0.5, 0.7 mm). Thick lines are typically about 2–3 times as wide as thin ones. In the AutoCAD step you will assign these weights through layers and plot style files; for now you only need to recognise them on paper.
The cut plane of a floor plan
A floor plan is a horizontal section through the building at about 1–1.5 m above the floor, viewed from above. That is why cut walls, columns and window frames are thick; floors, stair treads and furniture below the cut are thin; beams and the floor above are dashed.
Grids, dimensions, levels and material hatches
These four tell the site crew exactly where something is and how high it is.
Grid lines
Grid lines are chain lines through the centres of the main walls and columns, with a circled label at the end. By convention, grids in one direction are numbered 1, 2, 3… from left to right and grids in the other direction are lettered A, B, C… from bottom to top; many offices skip letters easily confused with numbers, such as I and O. The grid is the backbone of the set: architecture, structure and MEP all share it, so grid names must match on every sheet.
Dimension strings and units
Lengths on Vietnamese architectural drawings are given in millimetres without writing "mm". A dimension has extension lines, a dimension line ending in arrows or 45° ticks (architects usually use ticks) and the figure written above the line. Plans normally have three outer tiers: the inner tier for openings and wall segments, the middle tier for grid-to-grid distances and the outer tier for the overall length. Read from the outside in, and always add up the middle tier to check it equals the outer one.
Levels
Levels are given in metres to three decimal places, with a triangle symbol pointing at the surface. The ±0.000 datum is usually the finished floor of the ground floor; higher surfaces have "+", lower ones "−" (for example the pavement at −0.450). Sections (Figure 2) are where levels are clearest: the floor levels and the roof are marked down one side of the drawing.
Photo: Schara, Mark, creator / Wikimedia Commons, Public domain
Material hatches and reference symbols
Cut elements are filled with material hatches: brickwork is usually drawn as parallel diagonal lines, while concrete, reinforced concrete, earth, timber and glass each have their own pattern. A good set always has a "general notes and legend" sheet at the front: read it before guessing. Plans also carry section marks (cut line, viewing arrows, name 1-1 or A-A), detail callouts (a circle with the detail number and the number of the sheet it is on), a north arrow and door swing arcs.
Title blocks and the order of an architectural set
The title block is the sheet's ID card. Reading it first stops you from using an outdated sheet, the wrong floor or the wrong scale.
What a title block contains
- Project name, address and client.
- Design firm and signatures: drafter, checker, lead designer, director.
- Drawing title (e.g. "Ground floor plan"), sheet number (e.g. KT-03, where KT stands for architecture), scale and date.
- Design stage (permit, construction, etc.) and a revision table (revision number, date, description).
The title block usually sits at the bottom right or runs along the right edge of the sheet (Figure 3 shows a plan with a horizontal title strip along the bottom and a graphic scale bar).
Photo: Drawn by J. Q. Marsh / Wikimedia Commons, Public domain
Typical sheet order in a townhouse set
- Cover and drawing list.
- General notes, legend, finishes schedule.
- Perspectives, site plan, setting-out plan.
- Floor plans for each level, roof plan.
- Elevations (front, side, rear).
- Sections (longitudinal, cross).
- Details: stairs, bathrooms, doors, balustrades, roof; door and window schedule.
After the architectural part (prefix KT in Vietnamese sets) come structure, electrical and plumbing, each with its own prefix (KC, D, N and so on, depending on the office). An architectural drafter must at least be able to read the structural plans to check that grids, columns and beams match the architectural drawings.
Reading a set in five passes
- Pass 1: read the drawing list, check every sheet is there, note the date and stage in the title block.
- Pass 2: read the general notes and legend.
- Pass 3: read each floor plan, cross-checking grids and dimension strings.
- Pass 4: read elevations and sections; cross-check levels against the plans.
- Pass 5: follow every callout to its detail sheet and note anything that does not match.
Reading drawings is a skill you can train, just like the blueprint reading classes of decades ago (Figure 4): spread the drawings out on a large table, read each sheet slowly and take notes alongside.
Photo: Marjory Collins / Wikimedia Commons, Public domain
Worked example: reading a 3-storey, 5 × 20 m townhouse set
Hanh, a graduate who has just joined an architecture office in Hanoi as a drafter, is asked to read the construction set for a 3-storey townhouse on a 5 × 20 m plot and report the key figures before redrawing it in AutoCAD.
Grid string along the length of the house
On the ground floor plan (1:100, sheet KT-03), the middle dimension tier along the house gives the distances between grids 1 to 6: 4,000 – 4,500 – 3,500 – 4,000 – 4,000. Hanh adds them: 4,000 + 4,500 + 3,500 + 4,000 + 4,000 = 20,000 mm, matching the overall 20,000 on the outer tier. On paper at 1:100 this length is 20,000 ÷ 100 = 200 mm.
Levels on the section
| Datum | Level (m) | Storey height (m) |
|---|---|---|
| Pavement | −0.450 | (ground floor 0.45 above pavement) |
| Ground floor | ±0.000 | 3.6 |
| First floor | +3.600 | 3.3 |
| Second floor | +6.900 | 3.3 |
| Roof slab | +10.200 |
Check: 3.6 + 3.3 + 3.3 = 10.2 m, exactly the roof slab level of +10.200. Height from pavement to roof slab: 10.200 + 0.450 = 10.650 m. Hanh checks this against elevation KT-08, which also shows +10.200 at the roof slab, so they match.
Choosing a paper size for the redraw
The house is 200 mm long on paper at 1:100; adding three dimension tiers at each end (about 30 mm each end) gives about 260 mm, which fits on A3 (420 mm) with room for the title block. At 1:50 the house is 20,000 ÷ 50 = 400 mm long, about 460 mm with dimensions, which exceeds the length of A3, so it needs A2 or A1. Hanh notes this to ask the lead designer whether they want A3 at 1:100 or A1 at 1:50. In the next step, when you draw plans with AutoCAD command aliases, you can reuse this 4,000 – 4,500 – 3,500 – 4,000 – 4,000 string; see AutoCAD shortcuts: common command aliases and editing acad.pgp.
Common mistakes when reading drawings
Measuring the print with a ruler
Sign: measurements off by a few hundred millimetres. Cause: a "fit to page" print that was scaled down. Fix: read the dimension figures; check the graphic scale bar on the print to see whether it is still accurate.
Confusing dashed and thin lines
Sign: mistaking a beam for a wall, or wall cabinets for base cabinets. Cause: forgetting the floor plan's cut plane. Fix: ask yourself "is this above or below 1 m?" before concluding.
Reading an outdated sheet
Sign: drawing from figures that have since changed. Cause: not checking the date and revision table in the title block. Fix: always check the latest revision against the drawing list before starting.
Dimension strings that do not add up
Sign: the middle tier total differs from the outer tier. Cause: an error by the previous drafter, or a segment you missed. Fix: add each segment again; if it still differs, note it and ask the lead designer, never change the figures yourself.
Frequently asked questions
What does a 1:100 scale mean on a drawing?
One unit on paper equals 100 units in reality: 1 mm on paper is 100 mm, 1 cm is 1 m. Townhouse plans, elevations and sections are usually at 1:100 or 1:50.
What units are used on architectural drawings in Vietnam?
Lengths are in millimetres without writing "mm"; levels are in metres to three decimal places, with ±0.000 usually at the finished ground floor.
What does a drawing title block contain?
Project name, address, client, design firm, drawing title and number, scale, date, design stage, signatures of the drafter, checker and lead designer, and a revision table.
Where should I start when reading a townhouse drawing set?
Start with the drawing list and general notes, then the floor plans, elevations, sections and finally the details. Always cross-check grids and levels between sheets.
What does a dashed line on a floor plan mean?
Something hidden or above the cut plane, such as beams, the edge of the floor above, wall cabinets or a double-height void.
Practice tasks and self-assessment
- Obtain a sample townhouse set (with the owner's permission, or one published for teaching) and build a drawing list table: sheet number, title, scale.
- On the ground floor plan, add up every middle-tier dimension string in both directions and compare with the outer tier.
- On a section, build a level table like Hanh's and work out each storey height.
- Circle any 10 symbols on a plan (dashed lines, grids, section marks, detail callouts and so on) and write what each one means.
Self-assessment criteria
- Pass: your drawing list has every sheet, in order, with the scale shown in each title block.
- Pass: dimension strings and storey heights add up to the overall dimensions and levels on the drawings (or you have clearly noted where they differ).
- Pass: you correctly explain at least 9 of the 10 circled symbols.
- Not yet: taking figures by measuring the print, or confusing dashed lines with visible ones.
Once you can read a full set fluently, move on to the next roadmap step: AutoCAD 2D: layers, blocks, plot styles, where you turn the conventions you have just learned into the office's standard layers, blocks, dimension styles and plot style files.
Keep learning architectural drafting: after drawing conventions come AutoCAD 2D, plans, elevations and sections, construction details, Revit modelling and sheet production, and a complete townhouse set. See the 8-step architectural drafter roadmap.