Aluminium & glass installer
An 8-step aluminium and glass path: glass handling and height safety, aluminium systems and glass types, site measuring, cutting and assembling frames, installing doors and windows, tempered glass partitions, shower enclosures and sealing gaps. Graduates can supply and fit doors and glazing for townhouses; suits careful people fine with heavy lifting.
Start here
Step 1: Glass handling, saws & height safety
One short lesson per step, 10–15 minutes on a phone. No sign-up needed.
Hands-on roadmap
Roadmap
- Step 1Lesson
Glass handling, saws & height safety
Use glass suction lifters, cut-resistant gloves and goggles; safe use of mitre saws and drills; harness use on upper floors and what to do when glass breaks.
No English content for this step yet.
- Step 2Lesson
Aluminium systems, glass & hardware
System vs basic profiles and wall thickness; tempered, laminated safety and insulated glass; hinges, multi-point locks, gaskets and silicone sealants.
Requires: Glass handling, saws & height safety
No English content for this step yet.
- Step 3Skill
Measuring openings & cutting lists
Measure openings at three points, check squareness and fitting gaps; sketch sash layouts and build optimised cutting lists to reduce profile waste.
Requires: Aluminium systems, glass & hardware
No English content for this step yet.
- Step 4Skill
Cutting and assembling frames
Cut 45 and 90 degree joints, punch, crimp corners, fit gaskets and hardware; common faults are open corners, sagging sashes and wrong drainage direction.
Requires: Measuring openings & cutting lists
No English content for this step yet.
- Step 5Skill
Installing doors, windows & sealing
Fix frames with anchors, align plumb and level, fill gaps with foam and silicone against leaks; adjust hinges and locks for smooth closing.
Requires: Cutting and assembling frames
No English content for this step yet.
- Step 6Skill
Glass partitions, floor-spring doors & showers
Fit framed and frameless glass partitions, floor-spring glass doors and shower enclosures; check tempered glass marks, expansion gaps and retaining channels.
Requires: Installing doors, windows & sealing
- Step 7Project
Project: system doors & shower for a townhouse
Measure, draw, cut, assemble and install a front door, two windows and a shower enclosure; water-test the seals and record handover with before and after photos.
Requires: Glass partitions, floor-spring doors & showers
No English content for this step yet.
- Step 8Assessment
Skills test, per-m2 quoting & getting jobs
Check sealing, squareness and smooth operation; quote per m2 for each profile system and glass type, stating warranty and lead time.
Requires: Project: system doors & shower for a townhouse
No English content for this step yet.
