Drywall & ceiling installer
An 8-step drywall path: working-at-height and electrical safety, board and stud types, suspended grid ceilings, flush and stepped ceilings, acoustic partitions, joint finishing against cracks, light cut-outs and access panels. Graduates can build ceilings and partitions for homes, offices and shops; suits careful people good with numbers.
Start here
Step 1: Scaffold, screw gun & hidden cable safety
One short lesson per step, 10–15 minutes on a phone. No sign-up needed.
Hands-on roadmap
Roadmap
- Step 1Lesson
Scaffold, screw gun & hidden cable safety
Work safely on mobile scaffolds and ladders; eye and dust protection when cutting boards; isolate power and avoid drilling into cables or pipes in the ceiling.
No English content for this step yet.
- Step 2Lesson
Boards, metal framing & fixings
Standard, moisture-resistant, fire-rated and acoustic boards; concealed and exposed grid systems, hangers and anchors; reading ceiling plans and estimating materials.
Requires: Scaffold, screw gun & hidden cable safety
No English content for this step yet.
- Step 3Skill
Laser levelling & suspended grid ceilings
Set heights with a laser, fit wall angles, main and cross tees, drop in tiles; common faults are sparse hangers that sag and out-of-square grids.
Requires: Boards, metal framing & fixings
No English content for this step yet.
- Step 4Skill
Flush and stepped ceilings
Build concealed frames, stagger board joints, keep correct screw spacing; create stepped ceilings, LED cove lighting and curtain pockets.
Requires: Laser levelling & suspended grid ceilings
No English content for this step yet.
- Step 5Skill
Partitions, acoustic & moisture-resistant walls
Build single and double-layer partitions, fill with mineral wool, reinforce studs for TVs and cabinets; use moisture-resistant boards in bathrooms and kitchens.
Requires: Flush and stepped ceilings
No English content for this step yet.
- Step 6Skill
Joint taping, crack prevention & finishing
Apply mesh or paper tape, fill joints in several coats and sand; why joints crack and how to prevent it; coordinate with painters before handover.
Requires: Partitions, acoustic & moisture-resistant walls
No English content for this step yet.
- Step 7Project
Project: stepped living room ceiling & partition
Complete a living room with a stepped ceiling, downlight cut-outs, an AC access panel and an acoustic partition; keep a log and photograph each stage.
Requires: Joint taping, crack prevention & finishing
No English content for this step yet.
- Step 8Assessment
Skills test, take-off & quoting
Check flatness, levels and crack-free joints; do quantity take-off from drawings, quote ceilings and partitions per m2, and find work via fit-out teams.
Requires: Project: stepped living room ceiling & partition
