A customer calls: “We're renovating the second floor and the builders are about to plaster the walls. Can you come and run concealed wiring for us, add a few sockets by the bed and move the light switch next to the door?” Done properly, you won't need to touch it for many years; done carelessly, the consequences lie hidden in the wall: cables that cannot be pulled out and replaced, buried joints that overheat, a customer drilling into a cable to hang a picture, or walls cracking along a chase cut too deep.
This lesson follows the order of work on site: marking routes, cutting chases, placing conduit and boxes, pulling cables, testing before plastering and handing over. For new houses, cable routes should follow the design drawings approved by the owner. By the end of this lesson, you will be able to plan straight cable routes, cut chases safely, choose conduit and calculate how many wires it can take, place boxes and conduit correctly, pull cables without joints inside the conduit, and test everything before the walls are plastered.
The design drawings and the manufacturer's instructions take priority over everything else; the figures in this lesson are for reference only. When renovating a house that is still energised: switch off the breakers for the area and verify that it is dead according to the 5 mandatory safety rules before cutting into the wall. Never cut or chisel into reinforced concrete columns, beams or slabs without the structural designer's approval.
How does concealed wiring differ from surface wiring?
Concealed wiring means placing cable conduit in chases in the wall (or ceiling, floor) and then plastering over it; the wall is flat and the cables are protected, but every mistake is hidden from view.
Criterion | Concealed in conduit | Surface-mounted in plastic trunking |
|---|---|---|
When it is done | Before plastering, tiling, painting | At any time |
Dust, noise, time | More, takes longer | Less, quick |
Replacing cables later | Possible, if the conduit is clear and there are no joints inside | Easy, open the trunking cover |
Hidden risks | Drilling into cables, buried joints, chases weakening the wall | Knocks, trunking coming loose |
If a finished house only needs one extra socket, surface wiring is usually more sensible; see the lesson on surface wiring with plastic trunking.
Step 1: Survey and agree positions with the customer
What to ask and record
The position of every device (sockets, switches, lights, air conditioner, water heater, network outlets): mark them directly on the wall and number them by circuit.
Furniture that will be placed (bed, wardrobe, TV unit, kitchen cabinets): sockets completely hidden behind a wardrobe are a common mistake.
Which circuit comes from which breaker: separate lighting circuits, socket circuits and dedicated circuits for heavy loads. Choose cable sizes according to the lesson on choosing cable sizes and circuit breakers for each circuit.
Wall type (brick, concrete, plasterboard), which walls are load-bearing, where the columns and beams are; water pipes, gas pipes, air-conditioning pipes already installed or planned.
The builders' schedule for plastering and tiling: all inspections must be finished before that date.
Reference mounting heights
Typical heights in homes, for reference only; drawings, customer requirements and furniture take priority.
Device | Height to the centre of the box from the finished floor level (for reference) | Notes |
|---|---|---|
Light switch by the door | About 1.2–1.4 m | On the door handle side |
Standard socket | About 0.3–0.4 m | Higher in homes prone to flooding |
Bedside socket | About 0.5–0.7 m | Avoid being hidden by the headboard |
Socket above the kitchen worktop | About 1.1–1.2 m | Based on the actual worktop, away from the sink |
Socket or outlet box for the air conditioner | Near the ceiling, next to the indoor unit position | According to the air-conditioner manufacturer's installation manual |
Tip: measure from the datum line the builders have snapped (usually +1.0 m), not from the rough floor, because the floor will rise when tiled.
Step 2: Mark the cable routes on the wall
The straight-line rule
The most important principle: concealed routes only run vertically or horizontally, never diagonally (the wiring regulations of some countries, such as the UK, are also based on this idea).
From each socket or switch, the route runs straight up to the ceiling, straight down to the floor, or horizontally to a device at the same height.
Horizontal routes run close to the ceiling or at the same height as the row of sockets, not across the middle of a wall where customers often drill to hang pictures or TVs.
That way, anyone who sees a socket can guess that the cable is directly above or below it. Diagonal routes to save cable are a common cause of “drilled to hang a picture and the breaker tripped”.
Through the ceiling or the floor?
Through the ceiling: the most common. Conduit runs above a plasterboard ceiling (it must be clipped or hung securely, not left loose on the ceiling panels) or is embedded in the upper floor slab according to the design, then turns down into the wall.
Through the floor: only when the ceiling cannot be used; use heavy-duty conduit, laid before the screed is poured, and avoid damp floors. Very hard to repair later, so keep it to a minimum.
Avoid water pipes and heat sources
Do not place electrical conduit directly below water pipes (if a pipe leaks, water follows it into the box). Keep a distance from hot water pipes, air-conditioning copper pipes and gas pipes; where they must cross, cross at right angles with a gap.
Route-marking example
A bedroom needs two extra bedside sockets and the light switch moved next to the door:
Switch by the door (1.3 m high) and left bedside socket (0.6 m high): each route is marked straight up to the ceiling, then runs above the ceiling to the room's junction box.
Right-hand socket: runs horizontally at 0.6 m behind the bed, fed from the left-hand socket (a place where no one drills).
Record the measurements of each route (how many cm from the wall corner) before cutting.
Step 3: Cut wall chases safely
Detect before you cut
A house under renovation may still have old cables and water pipes in the walls. Before cutting:
Switch off the breakers for any circuits that may pass through the area and verify they are dead.
Scan along the route with a metal and cable detector. Detectors do not see everything (for example, plastic pipes full of water), so you must still ask the owner, look at old drawings, and note the positions of taps and sanitary fittings.
Plug the cutting machine into a socket with residual current protection (RCD); keep the machine's power cord away from the cutting line.
Tools and protective equipment
A wall chaser (two parallel diamond blades, adjustable depth, vacuum connection) produces even chases with less dust. Alternatively, use an angle grinder to cut two parallel lines and then chisel out the middle.
Protective equipment: safety glasses, a good-quality fine-dust mask, ear defenders and gloves. Dust from cutting brick and concrete contains crystalline silica, which causes lung disease with long-term exposure; a cloth mask is not enough.
Cover furniture and use a vacuum extractor when working in an occupied house.

Chase dimensions
A chase only needs to be big enough for the conduit to sit fully recessed with a layer of plaster over it. Too deep weakens the wall; too shallow leaves thin plaster that cracks along the conduit.
Conduit size (outside diameter) | Reference chase width | Reference chase depth | Notes |
|---|---|---|---|
16 mm conduit | About 20–25 mm | About 20–25 mm | Often used for lighting and switch circuits |
20 mm conduit | About 25–30 mm | About 25–30 mm | Often used for socket circuits |
25 mm conduit | About 30–35 mm | About 30–35 mm | Heavy-load circuits, main runs to the board |
Two conduits side by side | Add the widths of both conduits and the gap between them | According to the largest conduit | Consider splitting into two chases if the wall is thin |
These are working rules of thumb, not standard values. On 100 mm (single-brick) walls, load-bearing walls or walls that are already cracked, limit the depth and the length of horizontal chases and consult the designer. Never cut chases on both sides of a wall at the same position.
Cutting technique
Snap a chalk line along the route, set the blade depth, cut a short test section and measure again.
Cut steadily, holding the machine with both hands and standing firmly; when working at height, stand on a scaffold or sturdy ladder and do not overreach.
Chisel out the middle gently without breaking the neighbouring bricks; cut box openings with a hole saw.
Clear dust and brick debris from the chase before placing the conduit.
Step 4: Choose the conduit and calculate how many wires it can take
Flexible or rigid conduit?
Flexible corrugated conduit: bends by hand, suitable for turns and curves. The corrugated interior makes pulling cables harder; thin types are easily crushed by bricks or mortar.
Rigid PVC conduit: smooth interior, easy to pull cables, strong, suitable for long straight runs and above ceilings. Bend it with a bending spring inserted inside or use elbow fittings.
Use conduit designed specifically for electrical cables, labelled with its standard and with a strength class suited to its location; do not reuse water pipe or thin plastic tubing of unknown origin.
Do not overfill the conduit
Wires inside conduit must have room to be pulled out and pulled in and to dissipate heat. A common rule of thumb: the total outer cross-sectional area of the wires should not exceed about 40% of the conduit's internal cross-section (for reference). How to calculate:
Look up the conduit's internal diameter (in the manufacturer's catalogue; flexible conduit has a smaller bore than rigid conduit of the same outside size).
Look up the wire's outer diameter including the insulation (wires of the same cross-section from different manufacturers have different insulation thicknesses).
Area of a circle = 3.14 × d² ÷ 4. Compare the total area of the wires with 40% of the conduit's internal area.
Example: 20 mm flexible conduit with an assumed internal diameter of about 14 mm → internal area ≈ 3.14 × 14² ÷ 4 ≈ 154 mm², 40% ≈ 62 mm². A 2.5 mm² single-core wire with an assumed outer diameter of about 3.8 mm → each wire ≈ 11.3 mm². So this conduit can take a maximum of about 5 wires of 2.5 mm².
Flexible conduit (outside size) | 1.5 mm² single-core | 2.5 mm² single-core | 4 mm² single-core | 6 mm² single-core |
|---|---|---|---|---|
16 mm | About 4 wires | About 3 wires | About 2 wires (not enough for one circuit with PE) | Not recommended |
20 mm | About 7 wires | About 5 wires | About 4 wires | About 3 wires |
25 mm | About 12 wires | About 8 wires | About 6 wires | About 5 wires |
The table above is for reference only, calculated with the 40% rule using assumed dimensions (internal bore of 16/20/25 mm conduit about 10.7/14/18 mm respectively; outer diameter of 1.5/2.5/4/6 mm² wire about 3.2/3.8/4.4/5.0 mm respectively). Recalculate using the real catalogue. For long runs with many bends, reduce the number of wires or increase the conduit size. When several circuits share one conduit, the wires run hotter under heavy load and their current-carrying capacity falls; heavy-load circuits should have their own conduit.
All the conductors of a circuit in the same conduit
The line, neutral and protective earth (PE) conductors of the same circuit run in the same conduit; do not put the line in one conduit and the neutral in another.
Use consistent wire colours: line red, brown or black; neutral blue; earth green/yellow. Even so, you must still measure to identify the wires, as described in the lesson on using a multimeter as an electrician.
Network, camera and antenna cables run in separate conduit, away from power conduit, and do not share boxes with power cables (except boxes with a partition).
Step 5: Place the conduit and boxes
Placing flush boxes
Set boxes flush with the finished wall surface (including plaster and tiles). A box set too deep means the faceplate screws won't reach; a box that protrudes means the faceplate won't sit flat.
Boxes in the same row should be at the same height and aligned; use a spirit level or a laser level.
Fix boxes with mortar; fit the cover or stuff them with paper so plaster does not fill the box and the conduit openings.
Placing conduit
Conduit runs continuously from box to box; if a joint is needed, use the correct type of coupler, sealed so mortar cannot get in.
The conduit end goes fully inside the box through a knockout, not left short outside the box (cables would rub against the brick edge and get scratched).
Secure the conduit in the chase with clips or dabs of mortar at intervals so it is not pushed out during plastering.
Minimise bends between two boxes. A common rule of thumb: no more than about 2 right-angle bends between two pulling points (for reference). If there are more, add an accessible pull box with a cover.
Bend with a generous radius; do not kink flexible conduit.
Leave a draw wire (thin steel wire or nylon cord) in the conduit if cables are not pulled straight away, so cables can be pulled easily later.

Step 6: Pull the cables and prepare the cable tails
Pull before or after plastering?
Pull as soon as the conduit is placed: you know immediately that the conduit is clear, but the cables may be scratched when the builders plaster or chisel.
Pull after plastering: the cables are not damaged during rough work and it proves that the conduit is still clear after plastering, which means the cables can be replaced later.
Either way, you must test-pull a draw wire through the conduit before plastering day.
How to pull cables
Leave enough spare cable at each end to make connections comfortably (a few tens of cm, for reference).
Tie the wires to the draw wire in a staggered fashion and wrap them with tape into a tapered end so they don't snag at bends.
One person feeds while the other pulls steadily; if it jams, ease back and pull again — do not yank. Only use lubricant made specifically for cable pulling, never motor oil.
Label the circuit number at both ends of each cable.
No joints in conduit, no buried joints
No joint may be located inside conduit. Cables run continuously from one box to another.
Joints may only be placed in junction boxes or device boxes with covers that can be opened for inspection; do not plaster over junction boxes or hide them behind built-in cabinets. For jointing techniques, see the lesson on how to join electrical wires properly.
Cable tails not yet connected to devices must be insulated individually, folded neatly into the box and covered.

Step 7: Testing before plastering
After plastering, fixing a mistake costs many times more. Carry out all four checks:
1. Visual inspection
Conduit is continuous, secured, enters the boxes and is not crushed; boxes are at the right height and covered; there are no diagonal routes and no joints outside boxes.
2. Continuity and correct identification
The cables are not yet connected to the supply. Using the continuity range: short two wires together at one end and measure at the other end to identify the correct pair and circuit number.
3. Insulation resistance test
Use an insulation resistance tester (megger) with the cables not yet connected to devices:
Measure between line–neutral, line–PE and neutral–PE for each circuit.
For standard 230 V circuits, IEC 60364-6 uses a test voltage of 500 V DC and requires no less than 1 MΩ; new cables are usually much higher. A result that is unusually low compared with similar circuits indicates a scratched or damp cable or one pierced by a nail.
Do not connect electronic devices, LED lights, power supplies or surge protectors during the test: the test voltage can damage them or distort the results.
Do not touch the cable ends during and immediately after the test (the cable may still hold a charge); discharge according to the instrument's instructions.
4. Record the cable routes
Photograph each section of wall with a tape measure extended from the corner or the floor, draw a diagram of the actual routes and give it to the owner to keep.
After plastering: install devices and test again
Remove the paper and excess plaster from the boxes and check the cable tails.
Measure insulation resistance again as in Step 7 to detect cables damaged by nails or drill bits during plastering or frame installation.
Install switches and sockets and connect the PE wire to the earth terminal of each socket; see the lesson on installing two-way switches and earthed sockets.
Energise one circuit at a time: measure the voltage at each socket, check line–neutral polarity, check the earth, and press the test button of the residual current device (RCD/RCBO).
Label the circuits in the distribution board; see the lesson on installing a household distribution board.
When to stop and advise the customer
Stop and inform the owner or consult a specialist when:
A route would have to cut through columns, beams or concrete slabs, a load-bearing wall, or a wall that is already cracked.
In an apartment: ask the building management first; party walls and service walls may not be allowed to be cut.
You find old cables of unknown circuits, brittle insulation, or old joints buried in the wall: recommend replacing the whole run rather than extending it.
You find gas or water pipes on the cutting route.

Hand over the diagram, photos and test results, with the advice not to drill directly above or below sockets and switches. For quoting and acceptance, see the lesson on quoting, taking on jobs and working with customers.
Safety checklist before plastering and handover
Breakers switched off, absence of voltage verified, old cables and pipes detected; no cutting into columns, beams or concrete slabs.
Safety glasses, fine-dust mask and ear defenders worn; cutting machine plugged in through an RCD.
Routes run only vertically or horizontally; photos taken and diagram drawn.
Conduit designed for electrical use, continuous, secured, ends inside the boxes, test-pulled.
Number of wires in each conduit within limits; line, neutral and PE of the same circuit in the same conduit.
No joints inside conduit; junction boxes have covers and are accessible; signal cables in separate conduit.
Continuity and insulation resistance tested before plastering and again after plastering.
RCD/RCBO tested, circuits labelled, diagram handed over to the customer.
Frequently asked questions
Can concealed wiring be plastered directly into the wall without conduit?
It is not recommended. Cables buried directly in plaster cannot be replaced when they fail and are easily scratched during plastering or chiselling. Always run cables in conduit designed for electrical use.
How deep should a wall chase for electrical conduit be?
Just deep enough for the conduit to sit fully recessed with a layer of plaster over it; for 16–20 mm conduit, chases are usually about 20–30 mm (for reference). On thin walls and load-bearing walls, limit the depth and consult the designer.
Can wires be joined part-way along a conduit inside the wall?
No. Cables must run continuously from box to box. Joints may only be placed in junction boxes or device boxes with covers that can be opened for inspection, not plastered over or hidden.
How can I tell where concealed cables run so I can drill the wall safely?
Look at the diagram and photos left by the electrician; if the rules were followed, cables run straight above or below sockets and switches. Before drilling, still use a detector and avoid drilling in line with electrical devices.
Can network and camera cables share conduit with power cables?
It is not recommended. Sharing conduit easily causes interference and is dangerous if the signal cable's insulation cannot withstand mains voltage. Use separate conduit and separate boxes.
Practice exercises
Exercise 1: Plan routes on paper. A 3.5 m × 4 m bedroom has 1 ceiling light, 1 switch by the door, 2 bedside sockets, 1 desk socket and 1 outlet box for the air conditioner. Plan routes using only vertical and horizontal lines, and note the height of each box, the position of the junction box, and the length of conduit and cable for each circuit.
Exercise 2: Conduit calculation. The socket circuit uses 2.5 mm² single-core wire (line, neutral, PE) and the lighting circuit uses 1.5 mm². If both circuits share a 3 m section of conduit up to the ceiling, is 20 mm flexible conduit enough? Calculate with the 40% rule using a real catalogue, then explain whether the conduit should be split.
Exercise 3: Practical (with an instructor): on a practice wall, place 1 switch box and 1 socket box connected by flexible conduit with one bend; pull 3 wires, test continuity and insulation resistance, and fill in the test sheet.
Pass criteria:
Straight routes, boxes at the correct height and aligned; continuous conduit entering the boxes; cables pulled without jamming.
No joints in the conduit; cable tails individually insulated and labelled.
Continuity and insulation resistance results recorded for each pair of wires.
Full protective equipment worn when cutting; photos and route diagram handed over.