To read industrial electrical drawings properly, go in order: the title block and symbol legend first, then the single-line diagram to see where power comes from and which panel it feeds, and only then the schematic, tracing current from the supply through each contact to the coil and the load. Every contact on a drawing is shown in its resting state, with no power applied and nothing pressed; beginners go wrong by reading contacts as if the machine were running. This lesson covers TCVN and IEC symbols, single-line diagrams, control circuits, the nameplates of MCBs, MCCBs, contactors, overload relays and timers, and how to use a clamp meter and an insulation tester, with a worked example of a 7.5 kW pump panel whose overload relay keeps tripping.
By the end of this lesson, you will be able to:
- Read the symbol legend, device codes (Q, K, F, M, S, H, X) and terminal numbers 13-14, 21-22, 95-96, A1-A2.
- Follow a single-line diagram down to one motor and list every supply feeding a panel.
- Explain each step of a direct-on-line starter with latching, indicator lamps and an overload relay.
- Read the nameplates of MCBs, MCCBs, contactors, overload relays and timers and spot a wrong setting.
- Measure current with a clamp meter, test insulation resistance correctly and record the results.
Learning industrial electrics properly? Reading drawings and switchgear is step 2 of the roadmap, right after electrical safety and lockout-tagout. See the 8-step industrial electrician roadmap to learn in the right order.
What a factory drawing set contains
Factory electrical drawings come as a set, not a single sheet. Skip the first pages and you can easily misread the symbols specific to that project.
Types of drawing in the set
- Drawing list and symbol legend: page numbers and the meaning of the symbols and abbreviations used in this set.
- Single-line diagram: supply, main switchboard, sub-boards, breakers, cables, capacitor banks, generators.
- Schematics: the power circuit and the control circuit.
- Wiring diagrams and terminal tables: which numbered wire lands on which terminal of strip X1.
- Panel layouts and floor plans: where devices sit inside the panel, and where panels and motors sit in the plant.
Title block and revision
The title block in the bottom right corner gives the drawing name, sheet number, drafter, date and revision. Compare the revision you are holding with the copy kept by the maintenance office. As-built drawings have been updated to match the installation and are more reliable than the original design. As in Figure 1, lay the drawing flat and read the title block and legend before tracing anything.
Grid references and cross-references
Schematic sheets are usually divided into numbered columns along the top edge and lettered rows down the left edge. Under each contactor coil there is a small table showing where its contacts appear; for example "13-14 /3.6" means the normally open contact is on sheet 3, column 6. The exact format depends on the CAD software, so check the notes on the first sheet.
TCVN and IEC symbols and device codes
Industrial electrical drawings in Vietnam mostly follow the IEC system. The international library of graphical symbols is IEC 60617, and the Vietnamese standards (TCVN) for electrical symbols are largely developed to be equivalent to IEC. Even so, every design firm and every imported machine (Japanese, Korean, Chinese, European) draws things a little differently. The safest rule: the legend of the drawing set itself is the reference. If you need to cite a specific TCVN number, look up the current edition with the official standards body rather than guessing.
Device letter codes
You will see IEC-style codes (Q1, K1, F1), Russian-influenced codes in older documents (QF, KM, SB) and English abbreviations (CB, MC, OL, PB) side by side.
| Device | IEC style | Other common codes | Symbol |
|---|---|---|---|
| Circuit breaker | Q | CB, MCCB, QF | Contact with a cross |
| Contactor | K (newer drawings may use Q) | KM, MC | Rectangular coil A1-A2 |
| Overload relay, fuse | F | OL, RN, FU | Thermal element drawn as a zigzag |
| Control relay, timer | K | CR, TR, T | Coil, contacts with a delay mark |
| Push button | S | PB, SB | Contact with a T-shaped actuator |
| Indicator lamp | H (newer drawings may use P) | PL | Circle with a cross |
| Motor, terminal | M, X | MT, TB | Circle with M 3~; box with terminal number |
Contact terminal numbers
- Main contacts: 1-2, 3-4, 5-6 (supply side L1, L2, L3; load side T1, T2, T3). Coil: A1-A2.
- Auxiliary contacts: the second digit is the function, 1-2 normally closed (NC), 3-4 normally open (NO); the first digit is the sequence. So 13-14 is the first NO contact and 21-22 the second NC contact.
- Special functions: 5-6 (NC) and 7-8 (NO) for time-delayed or protective contacts; an overload relay has 95-96 (NC, opens the control circuit) and 97-98 (NO, fault signal).
How contacts are drawn
Drawings show the resting state: coils de-energised, buttons not pressed, overload relays not tripped. Normally open contacts are drawn open, normally closed ones drawn closed. As you read, "energise it in your head" step by step: when a coil pulls in, flip every contact belonging to it.
Reading the single-line diagram: where your panel gets its power
A single-line diagram draws all three phases as one line, with small slashes showing the number of conductors. It is the first page to open when you list sources before lockout-tagout.
Read from the top down
- Supply: a transformer stepping down to 0.4 kV (380/220 V in Vietnam), possibly with a generator through an automatic transfer switch (ATS).
- Main breaker (ACB or MCCB) and current transformers (CTs) for metering.
- Main switchboard (MSB) busbars and outgoing MCCBs to distribution boards (DB), motor panels and capacitor banks.
- Cables marked with material and size, for example "Cu/XLPE/PVC 4x6 mm2": copper conductors, XLPE insulation, PVC sheath, four cores of 6 mm2.
- Final loads: motors, furnaces, lighting, each with its rating.
Figure 2 shows a single-line diagram of a board and the real board it describes: each branch on paper is a breaker on the DIN rail.
Photo: Dmitry G / Wikimedia Commons, CC BY-SA 3.0
Find every supply into a panel
A motor panel can be fed from several places: the main supply, a 220 V control supply from another board, an anti-condensation heater, a UPS for the PLC, a generator. The drawings are where you learn this before opening the panel door. For the procedure to isolate, lock and prove dead each source, see lockout-tagout for electrical panels.
Reading power and control schematics
The power circuit is drawn with all three phases; the control circuit is drawn as rungs between two supply rails, read left to right and top to bottom.
Direct-on-line power circuit
L1, L2, L3 → breaker Q1 → main contacts of contactor K1 → overload relay F1 → motor M1, with the frame bonded to PE. Q1 protects against short circuits, F1 against overload, and K1 does the everyday switching.
Latching control circuit
- 220 V control supply through a small breaker F2 (for example 1-pole 2 A).
- Stop button S0 (21-22) in series with start button S1 (13-14).
- K1 13-14 in parallel with S1: the latching (seal-in) contact.
- K1 coil (A1-A2), through F1 95-96, back to neutral N.
- Lamp H1 (green, running) through K1 23-24; H2 (red, overload) through F1 97-98.
Press S1: current flows through S0, S1, the K1 coil and 95-96 to N; K1 pulls in, 13-14 closes so it stays in when S1 is released, and H1 lights. Press S0 or let F1 trip and K1 drops out; a trip also closes 97-98 and H2 lights. Figure 3 is a real schematic for a circular saw that contains both parts.
Photo: Dmitry G / Wikimedia Commons, CC BY-SA 3.0
Wire numbers and terminals
Every wire in the panel has a number, and every point that is electrically the same carries the same number. Machine push buttons, limit switches and float switches connect back through terminal strip X1. When fault-finding, follow the wire number to the terminal strip and measure there first before going out to the field.
Switchgear: reading MCB, MCCB, contactor, overload relay and timer nameplates
The nameplate tells you whether the device matches the drawing and is set correctly.
| Device | Job | Read on the nameplate | Common mistake |
|---|---|---|---|
| MCB | Protects small circuits | In, B/C/D curve, breaking capacity | Curve B on a load with high inrush |
| MCCB | Protects boards and large feeders | Frame AF, In, Ir range, Icu, Ics | Reading the frame size and not the Ir setting |
| Contactor | Everyday switching | AC-3 current, coil voltage | Sizing a motor contactor on its AC-1 rating |
| Overload relay | Motor overload protection | Setting range, trip class, reset mode | Setting it to the contactor rating |
| Timer | Adds a time delay | Delay type, time range, pin diagram | Wiring to another brand's pin diagram |
MCBs and MCCBs
MCBs to IEC 60898-1 have a fixed rated current and a magnetic trip curve: B at roughly 3 to 5 times In, C at roughly 5 to 10 times, D at roughly 10 to 20 times. MCCBs to IEC 60947-2 handle higher currents and are usually adjustable: the frame size (for example 250AF) is the case size, while the actual protection current is the Ir setting on the dial. Icu is the ultimate short-circuit breaking capacity and Ics the capacity after which the breaker can stay in service; both must exceed the prospective fault current at that point, which the designer calculates.
Photo: Balurbala / Wikimedia Commons, CC BY-SA 3.0
With a device like the one in Figure 4, check both the label and the trip settings against the drawing: if the drawing says "MCCB 3P 630A, 50 kA", the installed In and Icu must not be lower.
Contactors and overload relays
Contactors to IEC 60947-4-1 list currents for several utilisation categories. For squirrel-cage motors, read the AC-3 current; the AC-1 figure is higher but only applies to resistive loads. The coil voltage printed next to A1-A2 must match the control supply on the drawing.
An overload relay (Figure 5) is set to the rated current on the motor nameplate for the connection and voltage in use, and its setting range must include that value. Class 10 suits most motors with normal starting; high-inertia loads may need class 20 or 30 as designed. Setting the relay in a star-delta circuit has its own rule, covered in the next step.
Photo: Dmitry G / Wikimedia Commons, CC BY-SA 3.0
Timers
There are two main types: on-delay (starts timing when energised, then switches its contacts) and off-delay (starts timing when the control supply is removed). Plug-in 8-pin timers have the pin diagram printed on the body and each brand differs, so always wire to the diagram on the timer in your hand.
Using a clamp meter and an insulation tester
A clamp meter measures current while the machine runs; an insulation resistance tester (often called a "megger") is used only on circuits that are isolated.
Clamp meter
- Clamp a single phase conductor (Figure 6): clamp a whole multi-core cable and the phase currents cancel, so the meter reads close to zero.
- Conductor centred, jaws fully closed to reduce error.
- The right meter: measuring after a VFD needs True RMS; the safety category (CAT III, CAT IV under IEC 61010) must suit the location, and factory boards call for at least CAT III.
- Leakage trick: clamp all three phases (and neutral) together; the reading is the leakage current.
Photo: No machine-readable author provided. Redecke~commonswiki assumed (based on copyright claims). / Wikimedia Commons, Public domain
Insulation resistance tester
The tester applies a high DC voltage (250, 500 or 1000 V) between a conductor and earth or between two conductors and shows the resistance in megohms (Figure 7). Common IEC practice for low-voltage circuits up to 500 V: test at 500 V DC, minimum 1 megohm. Healthy motors and cables usually read tens to hundreds of megohms; the exact acceptance level follows the manufacturer's documents and plant rules.
Photo: Tambo / Wikimedia Commons, CC BY-SA 3.0
Insulation test procedure
- Isolate, lock out, tag and prove dead.
- Disconnect or isolate electronics: VFDs, PLCs, digital meters, surge protection devices, LED lights.
- Check the tester: leads shorted read near zero, leads apart read very high.
- Test each phase to PE, then phase to phase, holding for about 1 minute before reading.
- Wait for the tester to discharge the circuit before removing the leads.
- Record test voltage, each value, temperature, date and time to compare next time.
Safety warning: Drawings can be out of date or miss a second source, so reading them never replaces proving dead: always isolate, lock out, tag and prove dead before touching conductors. Clamping in a live panel is work near live parts: do it only when assigned, after electrical safety training required by your employer, wearing insulating gloves and suitable PPE, clamping only insulated conductors and keeping well away from bare busbars. An insulation tester produces hundreds of volts: warn people nearby, do not touch the leads or the circuit under test, and discharge before disconnecting. Never use a meter with a lower safety category than the location requires, or leads with damaged insulation.
Worked example: a 7.5 kW pump panel that keeps tripping
Work order: cooling pump no. 1 runs for about 20 minutes, then the overload relay trips and the red lamp lights; the relay was replaced last month. You are checking it with a senior electrician.
Step 1: read the drawings
- Single-line diagram: board DB-2, MCCB Q4 3P 40 A, 4x6 mm2 cable to the pump panel.
- Pump panel power circuit: Q1 3P 32 A, K1 18 A (AC-3), F1 range 12–18 A, 4x4 mm2 cable to M1.
- Control circuit: F2 1P 2 A, latching circuit as above; a note reads "Panel heater E1 fed from DB-L1, F3": a second source, so F3 must be locked too.
- Motor nameplate: 7.5 kW, delta 380 V 15.2 A / star 660 V 8.8 A; on a 380 V supply it runs in delta, rated current 15.2 A.
Step 2: check devices against the drawing
K1 at 18 A is above 15.2 A: pass. The F1 range includes 15.2 A: pass. But the F1 dial sits at 12 A, the bottom of its range: whoever replaced it never set it. The pump draws about 14 A, more than 12 A, so the relay heats up slowly and trips. That is the most likely cause, but you still need to be sure the motor insulation is sound.
Step 3: insulation test
Lock Q4 and F3, open Q1, prove dead, disconnect the motor cable from F1 and test at 500 V DC for 1 minute:
| Pair | Result | Assessment (minimum 1 megohm) |
|---|---|---|
| U – PE | 180 megohms | Pass |
| V – PE | 210 megohms | Pass |
| W – PE | 195 megohms | Pass |
Step 4: set, test run, measure current
Reconnect the cable, set F1 to 15.2 A, remove locks in the correct order and start the pump. After 30 minutes the clamp meter reads L1 = 14.1 A, L2 = 14.6 A, L3 = 13.9 A. Average (14.1 + 14.6 + 13.9) / 3 = 42.6 / 3 = 14.2 A, below 15.2 A. L2 is 0.4 A above the average, about 2.8%: a small difference. The pump runs the whole shift without tripping.
Time: reading drawings 20 minutes, lockout-tagout 15 minutes, insulation test 15 minutes, setting and test run 20 minutes, report 10 minutes; total 20 + 15 + 15 + 20 + 10 = 80 minutes, not counting 30 minutes of monitoring. The report records the old setting of 12 A, the new 15.2 A, the insulation results and the three phase currents.
Common mistakes when reading drawings and testing
Reading contacts as if the machine were running
Sign: you decide a contact is "closed" but it measures open. Cause: forgetting that drawings show the resting state. Fix: start from rest and mark in pencil which coils are energised.
Trusting the drawing over the installation
Sign: wire numbers or terminals do not match. Cause: the panel has been modified without updating the drawing, or you have the wrong revision. Fix: check the revision, ask for the as-built set, mark differences in red and tell whoever keeps the records.
Clamping the whole cable
Sign: the motor runs but the meter shows a few tenths of an amp. Fix: clamp each core where the cable has been split, usually at the overload relay outputs.
Insulation testing with electronics still connected
Sign: after testing, a VFD or digital meter will not power up. Cause: the test voltage went into the electronics. Fix: use the drawing to find every electronic device on the circuit and isolate it before testing.
Frequently asked questions
Are TCVN and IEC industrial electrical symbols different?
The basic graphical symbols are largely equivalent. The real differences are in letter codes (K or KM, F or OL) and each manufacturer's drawing habits. The legend in the drawing set is the reference.
What is a single-line diagram, and how is it different from a schematic?
A single-line diagram draws three phases as one line to give an overview of distribution. A schematic shows every wire and every contact. Use the single-line diagram to list sources; use the schematic to fault-find control circuits.
What is the difference between an MCB and an MCCB?
An MCB is small, has a fixed rating and lower breaking capacity, and is used for branch and control circuits. An MCCB handles higher currents, is usually adjustable, has a higher breaking capacity and is used for main boards and large feeders. Choosing between them is a design decision; the electrician reads and installs what the drawing specifies.
What insulation resistance should a motor have?
Common practice on a 380/220 V supply is a 500 V DC test with a minimum of 1 megohm. What matters most is the comparison with earlier readings: a sharp drop, even if still above 1 megohm, means the motor needs drying out or further checks.
Practice exercises and self-assessment
- Using a real panel drawing set, list every supply into the panel and where each is isolated.
- Hand-draw a direct-on-line starter with latching and two lamps, with correct terminal numbers.
- Read the nameplates of one MCCB, one contactor and one overload relay and compare them with the drawing.
- Under a senior electrician's supervision, measure the three phase currents of a running motor and insulation-test an isolated motor.
Self-assessment criteria
- Pass: all sources listed, including those from other boards; you can explain why the contactor stays in after the start button is released; the average current is correct; the insulation test follows all 6 steps.
- Not yet: a second source missed, NC and NO confused, the whole cable clamped, or an insulation test done before lockout-tagout.
Once you can read drawings and switchgear, move on to the next step: Wiring three-phase motors & starters, where you wire terminal boxes, reversing circuits and timed star-delta starters. For a preview, see the star-delta starter wiring diagram to see these symbols used in a complete circuit.
Keep learning industrial electrics: after drawings and switchgear come motor wiring, VFDs, PLCs, panel building and factory maintenance. See the 8-step industrial electrician roadmap to track your progress.