The basic building materials a mason handles every day are cement (usually PCB30 or PCB40 blended Portland cement in 50 kg bags), sand (masonry sand, plastering sand and coarse concrete sand), aggregate (1x2 stone for concrete, 4x6 stone for blinding) and bricks (solid fired clay, hollow clay, unfired concrete blocks and lightweight blocks). A good mason does not just know the names: they look, squeeze and tap to tell a good batch from a bad one, and store materials so cement does not lump and sand does not pick up soil. This lesson teaches exactly that for house building in Vietnam, with a worked example of receiving a delivery where every figure adds up.
By the end of this lesson, you will be able to:
- Read a cement bag: tell PCB30, PCB40 and PC40 apart, find the production date, and pick the right type for masonry mortar, plaster and concrete.
- Tell masonry sand, plastering sand and concrete sand apart, and run a jar test to estimate silt in sand.
- Spot the signs of salty sand and know when a lab test is needed.
- Tell solid bricks, hollow bricks, concrete blocks and lightweight blocks apart, and spot underfired or overfired bricks by eye and by ear.
- Check the volume of a truckload of sand or stone on delivery and stack cement so it stays dry.
Learning to be a mason from the ground up? Materials are step 2 of the roadmap, after scaffold safety and PPE, and before mixing mortar and pouring concrete. See the 8-step mason (bricklayer) roadmap to learn in the right order.
Why does a mason need to understand materials?
A wall is only as good as what it is made of. Mix to the right ratio with lumpy cement, muddy sand or underfired bricks and the wall still cracks and the base still blooms with salt. On Vietnamese house builds the lead mason often receives deliveries on behalf of the owner, so your trained eye really matters.
Three questions before using any batch
- Is it the right type? Plastering sand is not for concrete, 4x6 stone is not for a floor slab.
- Is it clean and sound? Look, squeeze, tap and run quick tests on site.
- Will storage ruin it? Wet cement and soil-laden sand are money lost before you lay a single brick.
What the mason decides and what the engineer decides
On a house with design drawings, the cement type, concrete grade and brick type are chosen by the engineer and written on the drawings; the mason uses exactly what is specified and reports at once when a delivery does not match. For small repairs without a design you can choose by common practice as in this lesson, but structural elements should still be checked with a qualified person.
Cement: PCB30, PCB40 and keeping it dry
Cement on Vietnamese house builds is mostly blended Portland cement, marked PCB and sold in 50 kg bags. The number after PCB is the minimum compressive strength of a standard mortar specimen at 28 days, in MPa (N/mm²): PCB30 is at least 30 MPa, PCB40 at least 40 MPa. Requirements for this type are in the Vietnamese standard TCVN 6260; plain Portland cement (PC) is covered by TCVN 2682. When you need to check, use the current edition of the standard and the information printed on the bag.
PCB30, PCB40 or PC40: what each is for
| Type | Characteristics | Typical use | Notes |
|---|---|---|---|
| PCB30 | Lower strength, usually cheaper, sets gradually | Masonry mortar, plaster, floor screeds, non-structural work | Concrete of the same grade needs more cement than with PCB40 |
| PCB40 | Higher strength, the most common type today | Foundations, columns, beams and slabs in houses; also fine for mortar | Plaster mixed too rich in cement tends to craze |
| PC40, PC50 | Little or no mineral additive, high strength | Demanding concrete, precast elements, as specified by the design | Rarely stocked by small suppliers |
Mortar grade and concrete grade are not the same as cement grade: M75 mortar can be made with PCB30 or PCB40, only the amount of cement per batch changes. Converting mixes into bags and buckets is the next step of the roadmap; if you need it now, see the grade 250 concrete mix ratio per bag and per bucket.
Read the bag before you accept it
- Type: PCB30 or PCB40 is printed large on the bag; compare it with the order.
- Production date or batch number: printed or stamped on the bag. Fresher is better; many manufacturers recommend using it within about 2–3 months, so read the exact period printed on the bag you buy.
- Weight: a standard bag is 50 kg. Weigh one or two random bags if you suspect short weight.
- Bag condition: torn or wet bags, or bags with hard water marks, are set aside and not accepted as good stock.
Quick test: is the cement still good or already lumpy?
Squeeze the bag: good cement is loose and soft like flour and gives under your hand. Hard lumps that crumble between your fingers usually come from compaction in a tall stack and are still usable once broken up. Lumps you cannot crush, that click like stone when tapped, mean the cement has absorbed moisture and started to set: discard it and never use it for structural concrete, even after sieving out the lumps.
Stacking cement to keep moisture out
Cement absorbs moisture from the air; it does not need rain to spoil. Figure 1 shows a common temporary cover: bags on a tarp with a plastic sheet, which only works for a few dry days. In the rainy season or humid weather, do it properly:
- Stack the bags on a pallet or boards about 10–20 cm off the ground, lined with plastic.
- Keep the stack about 20–30 cm away from walls.
- Stack no more than about 10 bags high so the bottom bags are not compacted hard.
- Cover all four sides with a tarp, weigh the edges down and leave no gap at the base.
- Write the delivery date on the bags and use older stock first.
Photo: Szlomo Lejb / Wikimedia Commons, CC BY 3.0
Safety warning: cement is strongly alkaline when wet with water or sweat; prolonged contact causes burns and cracked skin, and cement dust in the eyes causes injury. When carrying, opening bags and mixing, wear gloves, goggles, a dust mask and long sleeves. If cement gets in your eyes, rinse immediately with plenty of clean water for at least 15 minutes and see a doctor. For 50 kg bags, squat, keep your back straight and lift with your legs; carrying them up or along scaffolding needs a second person.
Masonry sand, plastering sand and concrete sand: telling them apart
Sand makes up most of a mortar, so the wrong or dirty sand ruins mortar faster than poor cement does. Names vary by region in Vietnam: in the north people say "black sand" (fine) for laying and plastering and "yellow sand" (coarse) for concrete; in the south they say "masonry and plaster sand" and "concrete sand". General requirements for aggregates for concrete and mortar are in TCVN 7570.
Three kinds of sand and where they go
| Sand | How to recognise it | Use for | Avoid for |
|---|---|---|---|
| Yellow (concrete) sand | Coarse, angular, gritty to the touch, yellow to brown | Concrete, floor bedding mortar, load-bearing masonry mortar | Fine finishing plaster (leaves coarse grain marks) |
| Masonry sand | Medium grains, often with some coarse ones | Mortar for laying bricks | Concrete for columns, beams and slabs |
| Plastering sand (fine black sand) | Small, even grains, smooth to the touch, few pebbles | Plaster, render, finishing coats | Structural concrete (needs more water, shrinks, weak) |
Plastering sand should be sieved before mixing to remove grit, rubbish and roots; the finishing coat needs finer sieving than the base coat. Figure 2 shows a heap of coarse building sand: up close, good sand has sharp grains and does not cake into lumps the way soil-laden sand does.
Photo: Confidence24 / Wikimedia Commons, CC BY-SA 4.0
Testing for silt and mud: the squeeze test and the jar test
Quick hand test: take a handful of slightly damp sand, squeeze it hard and open your hand. Clean sand falls apart and leaves only a few grains; dirty sand holds together in a ball and leaves brown smears on your palm. To be surer, do the jar test:
- Take a clear, straight-sided plastic bottle (a 1.5 litre bottle with the neck cut off) and fill it about one third with sand.
- Add clean water to about two thirds full, plus a pinch of table salt to help the silt settle.
- Cover the top, shake hard for about 1 minute, set it on a level surface and leave it for at least 1–3 hours.
- Sand settles at the bottom and silt forms a fine layer of a different colour on top. Measure the height of both layers with a ruler.
- Work out the ratio: silt height ÷ sand height × 100%.
This is only an on-site estimate and does not replace a standard lab test (the standard works by mass, the jar measures layer height). As a mason's rule of thumb, a silt layer of about 5% or more is suspect: concrete sand should be replaced or washed, and for masonry or plaster sand let the owner or site supervisor decide.
Spotting salty sand
Salty sand is sea sand, sand from brackish river mouths or sand that has not been washed free of salt. Salt keeps walls damp, causes white salt bloom (efflorescence) and rusts the steel in concrete. Signs:
- Very round, even, fine, pale grains mixed with bits of shell or coral.
- Stir a handful of sand into a glass of clean water, let it settle and touch the clear water to the tip of your tongue: a clear salty taste is suspicious (taste only, do not swallow).
- A heap left to dry shows a white salt crust; a trial patch of plaster shows white streaks and feels damp after a few weeks.
- Unclear origin and a suspiciously low price.
Tasting and looking only catch heavily salted sand. To be sure, send a sample to a building materials lab for a chloride ion (Cl⁻) test; for reinforced concrete, do not use suspect sand until you have the result.
Aggregate: 1x2 stone, 4x6 stone and stone dust
Coarse aggregate goes into concrete and blinding layers, not into masonry mortar or plaster. In Vietnam it is named by size in centimetres: 1x2 stone is crushed stone of about 10–20 mm. Good aggregate is angular, hard and free of dust and soil (Figure 3).
Photo: Microrao / Wikimedia Commons, CC BY-SA 4.0
Common sizes on house builds
- 1x2 stone: concrete for foundations, columns, beams, slabs and stairs. The most used size.
- 2x4 and 4x6 stone: blinding concrete under foundations, floor sub-base and hardcore; not for thin elements with dense reinforcement.
- Stone dust (0x5): fine material for bedding layers, concrete blocks and, in some places and only where specified, partly replacing sand.
Checking stone on delivery
- Rub a handful of stone in your palm: lots of muddy dust means dirty stone that must be washed before concreting.
- Many flaky, leaf-like grains or soft grains you can crush by hand mean poor stone; ask for a replacement.
- No roots, broken brick or clods of soil; tip it onto a tarp or a hard floor.
Bricks: solid, hollow, unfired and lightweight blocks
Bricks in Vietnam fall into two groups: fired clay bricks (the traditional red brick) and unfired bricks (hardened with cement, never kiln-fired). Each has its own sizes, laying method and faults. How many bricks a square metre of wall needs is covered in how to calculate bricks for a wall; here you learn to tell them apart and check their quality.
Comparing common bricks
| Brick | Common size (mm) | Strengths | Notes when laying |
|---|---|---|---|
| Solid fired clay brick | 220 × 105 × 60 | Good load bearing, good mortar bond | Heavy; for foundations, load-bearing walls, water tanks and where fixings must hold |
| 2-hole brick (north) | 220 × 105 × 60 | Lighter and cheaper than solid | Partition and external walls; wet before laying |
| 4-hole tube brick (south) | 80 × 80 × 180 | Light, fast to lay | Thin walls, break when chased; build heavy fixing points in solid or thin solid brick |
| Concrete block (unfired) | 390 × 190 × 190, 390 × 100 × 190… | Large, uniform, fast to lay | Heavy per block; do not soak; fill joints fully |
| Lightweight block (autoclaved aerated concrete, foam concrete) | Blocks, e.g. 600 × 200 × 100 | Very light, good insulation, cut with a hand saw | Usually laid with special thin-joint mortar or adhesive as the maker instructs |
Actual sizes vary by a few millimetres between kilns and brands, so always measure a few bricks before setting the string line. Figure 4 shows a pile of hollow bricks at a brickyard on the Ben Tre River, a type very familiar in southern Vietnam.
Photo: Balon Greyjoy / Wikimedia Commons, CC0
Checking fired clay bricks: colour and sound
- Well fired: even red colour through the brick, sharp edges, not warped. Tap two bricks together and they ring clearly.
- Underfired: pale pink or pale orange, a dull thud when tapped, powders when scratched with a nail, absorbs a lot of water. Walls built with them stay damp, grow moss and decay.
- Overfired: dark, almost black, glassy surface, often warped or cracked; poor mortar bond and hard to lay to a flat face.
- Warped or chipped: lay the brick on a flat surface; a gap of more than about 3 mm means warped. Many chips mean thicker plaster later.
When in doubt, weigh 3 dry bricks, soak them for 24 hours, wipe them dry and weigh again: the gain divided by the dry weight is the water absorption. A brick that absorbs much more than the others, or has a soft surface after soaking, is underfired.
Unfired and lightweight blocks: what to check
Unfired blocks harden with cement, so they need enough curing days at the factory; blocks delivered too early are still damp, their corners break easily and they powder when scratched. Also check for even colour, even size and no hairline cracks. Figure 5 shows a wall of aerated concrete blocks: large units, thin joints and a flatter face than a red brick wall.
Photo: Kolforn / Wikimedia Commons, CC BY-SA 4.0
The Vietnamese government encourages unfired building materials, and some projects (especially publicly funded ones) have their own requirements; on such projects, ask the supervisor which regulation currently applies.
Wetting bricks before laying
Dry fired clay bricks suck water out of the mortar very fast, so the joint "dies" before it can bond. Common practice is to soak the brick stack a few hours before laying so the bricks are damp on the surface but not dripping. Concrete blocks and lightweight blocks are not soaked; follow the maker's instructions.
Worked example: receiving the first delivery for a townhouse ground floor
Situation: a 4 × 15 m townhouse on the edge of a city; the owner asks you, as lead mason, to receive the first delivery for the ground floor walls. The order: 40 bags of PCB40 cement, 3.5 m³ of masonry sand, 2 m³ of 1x2 stone and 3,000 two-hole bricks.
Step 1: check the sand volume with a tape
Sand and stone are sold by volume (m³) measured in the truck bed. Before tipping, measure the inside of the bed: 3.2 m long, 2.0 m wide. With the sand roughly level, measure its depth at the four corners and the middle: 0.50, 0.55, 0.60, 0.55 and 0.55 m. Average depth = (0.50 + 0.55 + 0.60 + 0.55 + 0.55) ÷ 5 = 2.75 ÷ 5 = 0.55 m. Volume = 3.2 × 2.0 × 0.55 = 3.52 m³, enough against the 3.5 m³ ordered.
Step 2: quick quality checks on the spot
- Cement: all 40 bags marked PCB40, produced this month, loose to the touch; one bag with a torn corner was swapped on the spot.
- Sand: jar test gives 9.0 cm of sand and 0.4 cm of silt. Ratio = 0.4 ÷ 9.0 × 100% ≈ 4.4%, below the suspect level of about 5%: accepted. The settled water does not taste salty.
- 1x2 stone: little dust on the hand, few flaky grains: accepted and tipped onto a tarp.
- Bricks: 10 bricks drawn at random from different stacks; 9 are evenly red and ring clearly, 1 is pale and underfired. Noted; if the next delivery has many underfired bricks, ask for a replacement.
Step 3: cost of the delivery (2026 reference, varies by region)
| Material | Quantity | Reference unit price (VND) | Amount (VND) |
|---|---|---|---|
| PCB40 cement, 50 kg bag | 40 bags | 95,000 | 3,800,000 |
| Masonry sand | 3.5 m³ | 350,000 | 1,225,000 |
| 1x2 stone | 2 m³ | 420,000 | 840,000 |
| Two-hole bricks | 3,000 bricks | 1,500 | 4,500,000 |
| Total | 10,365,000 |
Check: 3,800,000 + 1,225,000 + 840,000 + 4,500,000 = 10,365,000 VND (about 400 USD). Unit prices are only for illustration; 2026 reference ranges, varying by region: PCB40 cement 80,000–115,000 VND per bag, masonry sand 250,000–500,000 VND/m³, 1x2 stone 300,000–550,000 VND/m³, two-hole bricks 1,100–2,000 VND each. Ask 2–3 suppliers before ordering.
Step 4: storage
The 40 bags of cement go in 4 stacks of 10 on pallets lined with plastic, 30 cm from the wall, fully covered with a tarp. The sand goes on a hard floor with boards on three sides. The bricks are stacked neatly, no higher than chest height, close to where they will be laid.
Common mistakes with building materials and how to avoid them
Tipping sand and stone onto bare earth
Signs: the bottom layer is mixed with soil and roots, and the last mortar of each batch looks dirty. Avoid it: lay a tarp, metal sheet or hard floor before the truck arrives.
Using plastering sand for concrete
Signs: the concrete is sloppy, needs lots of extra water, then cracks and honeycombs when dry. Cause: fine sand soaks up water and cement. Avoid it: tip each sand type separately and label each heap.
Cement stacked against walls or on the ground
Signs: the bottom bags set into hard blocks after a few humid weeks. Avoid it: use pallets, keep clear of walls, cover fully and order in step with progress.
Mixing brick types in one wall
Signs: a vertical crack where the two types meet. Cause: fired and unfired bricks expand and absorb water differently. Avoid it: one type per wall; if you must join them, ask the engineer.
Frequently asked questions
What is the difference between PCB30 and PCB40 cement?
The minimum compressive strength at 28 days: PCB30 is at least 30 MPa, PCB40 at least 40 MPa. PCB40 is widely used for structural concrete because it needs less cement for the same grade; PCB30 suits masonry mortar and plaster. Use whatever the design specifies.
How is masonry sand different from plastering sand?
Plastering sand has small, even grains with few pebbles for a smooth wall; masonry sand is medium-grained and may contain coarser grains. Do not use plastering sand for structural concrete.
How can I tell salty sand on site?
Round, even grains with bits of shell; the settled water tastes salty; a dried heap shows a white crust. These are only warning signs; a chloride ion lab test gives a definite answer.
How long can cement be stored before it is unusable?
There is no single number. Cement slowly loses strength, faster in a damp store. Use it within the period printed on the bag and throw away bags with lumps you cannot crush by hand.
Are unfired bricks better than fired bricks?
Each suits different jobs. Unfired blocks are uniform, fast to lay and need no kiln fuel; fired clay bricks are familiar to masons and bond well with mortar. What matters is the right type for each wall and the right mortar.
Practice exercise and self-assessment
- At a building supplier or a site near you, note the cement type, the production date on the bag and how the store is stacked.
- Take 2 different sand samples, run the jar test and record the sand height, silt height and percentage.
- Pick 10 fired clay bricks, sort them into well fired, underfired and overfired by colour and sound; soak 3 to compare water absorption.
Self-assessment criteria
- Pass: you can name and give the use of the 3 sands, 3 stone sizes and 5 brick types in this lesson, and read the type and production date on a cement bag.
- Pass: your jar test ratio is calculated correctly and your accept-or-replace decision follows the threshold you learned.
- Pass: your truckload volume and cost table add up and are marked "reference".
- Not yet: cement stacked on the ground or against a wall, plastering sand used for concrete, bricks accepted without sampling.