A house can have new wiring, good MCBs and a 30 mA RCD, and still be unsafe if its earthing is poor. The earth connection lets a fault on a metal appliance case be detected and cleared before someone touches it. It is buried and easy to get wrong, so it deserves the same care as the distribution board.
This guide covers earthing a typical house step by step: the parts of the system, choosing a location and driving an earth rod, sizing and connecting the earthing conductor, the main earthing terminal and bonding, and testing. It is written for trainee electricians working on single-phase supplies in Vietnam (nominally 220–230 V, 50 Hz), but the principles apply to most countries.
Scope and safety. This article explains general principles; it is not a design guide and does not replace local wiring rules. Always isolate the supply before connecting to the main earthing terminal, never disconnect the main earthing conductor while the installation is energised, and check for buried cables and pipes before you dig or drive anything into the ground. Learners should only do this work under the supervision of a qualified electrician. Every number in this article is for reference only; local regulations, the supply authority, the system designer and the equipment manufacturer's instructions always take priority.
Why earthing matters, especially with RCDs
When insulation fails inside a washing machine or water heater, the line conductor can touch the metal case. If the case is earthed, fault current flows through the protective conductor and the protective device disconnects the supply. If it is not earthed, the case sits at a dangerous voltage until a person touches it and becomes the path to earth.
How the fault is cleared depends on the earthing system:
In a TN system, the supply provides a low-impedance path back to the transformer (a separate protective conductor or a combined PEN conductor). A line-to-earth fault produces a large current that can trip an MCB quickly.
In a TT system, the supply transformer is earthed at the substation, and the consumer has their own, separate earth electrode. Fault current has to return through the soil, so it is usually far too small to trip an MCB. Protection relies on an RCD (or RCBO), which detects the imbalance between line and neutral current.
Many houses in Vietnam receive only a line and a neutral conductor from the supply and rely on an earth electrode installed at the property, which in practice makes the installation work like a TT system. However, arrangements differ between areas, buildings and supply authorities, so do not assume: ask the supply authority or check the design documents for the building you are working on.

Figure 1. Concept of the TT earthing system. The star point of the supply transformer is earthed at the substation, while the exposed metal parts in the consumer's installation are connected to the consumer's own, separate earth electrode. Because earth-fault current must return through the soil, it is usually too small to trip an MCB quickly, so an RCD provides the disconnection. The diagram shows three phases; a typical house receives one line and the neutral. (Diagram: DiscreetParrot, based on a public-domain original by Markus Kuhn, Wikimedia Commons, CC0)
Two practical consequences follow for a TT-type house:
The RCD needs the earth. Without one, the RCD trips only when a person becomes the path, after the shock has started. With a good earth, it trips on the fault current before anyone touches the case.
Electrode resistance limits the touch voltage. A widely used TT design check is that electrode resistance multiplied by the RCD's rated residual current should not exceed a safe touch voltage, commonly taken as 50 V. For a 30 mA RCD this gives a very high theoretical limit, but designers and supply authorities usually ask for a much lower, more stable value. Treat it as a minimum condition, not a target.
The parts of a house earthing system
Earth electrode (earth rod)
The metal part in contact with the soil, in houses usually one or more driven rods of copper-bonded, galvanised or stainless steel. Some buildings use a foundation electrode in the concrete, buried strips or plates instead.
Earthing conductor
The conductor, normally green/yellow insulated copper, that joins the electrode to the main earthing terminal. It carries fault current, so its size, route and connections matter.
Main earthing terminal (MET) or main earth bar
The point where the earthing conductor, the circuit protective conductors and the main bonding conductors meet. It is often an earth bar in or next to the distribution board.
Circuit protective conductors (PE)
The green/yellow conductors that run with each circuit to the earth terminal of every socket-outlet, metal light fitting and fixed appliance.
Main protective bonding
Conductors that connect extraneous-conductive-parts (metal entering from outside, such as metal water or gas pipes and structural steel) to the MET, so that metal parts stay at the same potential during a fault.
Reference table: components, typical materials and tests
The table summarises what you will typically meet on a house job. All values are for reference only; check your local regulations, the equipment manufacturer and the supply authority for the values that apply to your installation.
Component | Typical material / form (for reference) | Typical size seen in houses (for reference) | How it is checked |
|---|---|---|---|
Earth rod | Copper-bonded steel, galvanised steel or stainless steel rod, often with a pointed tip and a driving head | Diameter around 14–16 mm, length around 1.2–2.4 m per section; extendable rods for deeper soil | Visual check, earth electrode resistance test |
Rod clamp | Bronze/brass or other clamp rated for the rod material and conductor size | Matched to rod diameter and conductor size | Visual and tightness check, inspection for corrosion |
Earthing conductor | Green/yellow insulated stranded copper; bare copper or strip where buried by design | Often 10–16 mm² copper in houses; larger if buried bare or required by the design | Continuity, visual check of route and terminations |
Main earthing terminal / bar | Copper or brass bar with screw terminals, sometimes with a disconnecting link | Enough terminals for all conductors, each labelled | Visual check, tightness, labelling |
Circuit protective conductor (PE) | Green/yellow copper, in the same cable or conduit as the circuit | For copper line conductors up to 16 mm², commonly the same size as the line conductor | Continuity (R1+R2 or similar), insulation resistance |
Main bonding conductor | Green/yellow copper to metal pipes and structural metal | Often not less than half the earthing conductor size, with a minimum such as 6 mm² copper | Continuity from bonded part to MET |
Earth electrode resistance target | Set by the designer, local rules or supply authority | Many specifications for houses ask for a few ohms to a few tens of ohms; lightning protection earths often have their own target | Dedicated earth resistance tester (fall-of-potential or clamp method) |
RCD | 30 mA RCD or RCBO for additional protection | Rated current and type chosen to suit the circuits | RCD tester (trip time at rated current) and the test button |
Step 1: Plan the job and make it safe
Find out the earthing arrangement. Is the house TT, or does the supply provide an earth terminal? Is there an existing electrode, lightning protection, or a design specifying the electrode and resistance target? If there is a design, follow it.
Isolate the supply before any work at the distribution board or MET. Lock off or tag the main switch, and prove dead with an approved two-pole voltage tester that you have proved on a known live source before and after the test.
Never disconnect an existing main earth with the power on. If the installation is live and a fault exists somewhere, the disconnected earthing conductor and every metal part connected to it can rise to a dangerous voltage. Disconnect only with the supply isolated, and reconnect before the supply is restored.
Check for buried services. Ask the owner, look at drawings, meter boxes, inspection covers and cable entry points, use a cable and pipe locator if available, and dig the first part of the hole by hand. A rod driven through a buried supply cable is a serious hazard.
Step 2: Choose the location for the earth rod
Soil: moist clay or loam usually gives lower resistance than dry sand, gravel or rock; a garden bed is often better than a concreted yard.
Distance from the building: keep the rod clear of foundations and footings, commonly around 1 m or more away, so that you do not hit concrete or disturb the structure. Follow the designer if they specify a distance.
Away from other services: keep well clear of buried cables, water pipes, drains, septic tanks and gas lines.
Access: the connection should stay reachable for inspection, ideally in an inspection pit, away from vehicles and garden work.
Short conductor route: the earthing conductor from the rod to the MET should be as short and direct as practical, with a protected route into the building.
If the house has a lightning protection system, the location and any connection between the lightning earth and the electrical earth must follow the lightning protection designer's drawings. Do not improvise either a separation or a connection.
Step 3: Drive the earth rod

Figure 2. A technician drives a copper-coloured earth rod into open ground with a hand-held driving tool, keeping the rod vertical. Before driving any rod, check for buried cables and pipes, and wear eye protection, gloves and safety footwear. (Photo: SRA Lakisha Croley, U.S. Air Force, via Wikimedia Commons, public domain)
Dig a starter hole by hand, a little wider than the inspection pit, to confirm there are no services just below the surface.
Fit a driving head (or use a rod driver) on top of the rod. Hitting the bare top of a copper-bonded rod with a hammer mushrooms the steel and can damage the copper coating, which later becomes a corrosion point.
Keep the rod vertical. Start with light blows and check with a spirit level or by eye from two directions. A rod that wanders off line is harder to drive and may not reach full depth.
Drive steadily to the full depth with a sledgehammer and driving head, a hand-held driver or a power hammer with the correct adaptor. For more depth, join extension sections with the manufacturer's couplers.
Stop if the rod suddenly refuses or bounces (rock, concrete or a buried object). Do not force it; move a short distance and try again.
Leave enough rod above the pit floor to fit the clamp comfortably.
If one rod is not enough, the designer may specify several rods connected together. As a rule of thumb, parallel rods should be spaced at least about their own driven length apart, often more; rods placed too close together share the same soil and add little. Deeper rods often help more than extra rods where the lower soil is moist.
Avoid old "tricks". Salt or charcoal around a rod may lower resistance briefly, but salt accelerates corrosion and washes away. In very poor soil, use only earth-enhancing materials specified by the designer or manufacturer.
Step 4: Connect the earthing conductor to the rod
The rod connection is often wet and must last for decades, so it is where most long-term failures start.
Use a clamp designed for earthing, rated for the rod diameter and conductor size and compatible with the rod material. A plain steel hose clip or a twisted wire is not an earth connection.
Watch for mixed metals. Copper conductors on galvanised steel, or the wrong clamp material, can corrode quickly in damp soil. Follow the clamp and rod manufacturer's guidance on compatible materials, and protect the joint (for example with a suitable anti-corrosion tape or compound) if the manufacturer recommends it.
Prepare the conductor properly. Keep all strands in the clamp and tighten to the manufacturer's torque if given.
Fit an inspection pit so that the connection can be seen, tested and re-tightened without digging. Do not bury the clamp under concrete.
Fix a permanent label, such as "Safety electrical connection – do not remove".
Protect the conductor route above ground with conduit or trunking, keep it short and direct, and avoid coils of spare cable.
Sizing the earthing conductor. The size depends on the fault current and disconnection time, the protective devices, the material, and whether the conductor is buried and protected against corrosion and damage. Many house installations use green/yellow insulated copper of around 10–16 mm² from rod to MET (for reference only); bare buried conductors usually need more. The design and local rules decide; when in doubt, ask the supervising electrician.
Step 5: Set up the main earthing terminal and bonding

Figure 3. An installed main earthing and equipotential bonding bar on a wall. Several green/yellow protective and bonding conductors arrive from above, and a galvanised steel strip of the kind used for buried or foundation earth electrodes is bolted to the bar. The protective cover (bottom of the picture) has been removed for inspection. Every conductor at a bar like this should be labelled. (Photo: Jarlhelm, Wikimedia Commons, CC BY-SA 3.0)
With the supply isolated and proved dead:
Bring the earthing conductor to the MET by the shortest protected route and terminate it in its own terminal.
Connect the circuit protective conductors to the earth bar in the distribution board, which is connected to (or is) the MET. Tighten and tug-test each one.
Install main protective bonding. Where metal water pipes, gas pipes or other metal services enter the building, connect them to the MET with bonding conductors and proper bonding clamps, close to the point of entry and on the building side of any meter or insulating section. Plastic pipes, common in Vietnamese houses, do not need bonding, but a metal pipe section or metal tank may. Follow the design and local rules.
Consider a disconnecting link. A removable link between the earthing conductor and the MET makes it possible to measure the electrode on its own. It must only be opened by a competent person with the supply isolated, and must need a tool to open.
Label the MET, the earthing conductor and each bonding conductor.

Figure 4. An earth disconnecting (test) link: a copper bar on an insulating base with bolted terminals. Removing the link separates the earthing conductor from the installation so the earth electrode can be measured on its own. Open it only with the supply isolated, and close it again before the supply is restored. (Photo: Pulsar, Wikimedia Commons, CC BY-SA 4.0)
Never link neutral and earth in the distribution board of a TT house to "improve" the earth. It can make the RCD trip or fail to see faults, and if the supply neutral is lost, every metal case can become live. Where the supply authority provides a TN-C-S arrangement, the neutral-earth connection is made only where they specify.
Step 6: Test the earth installation
Record every result, the instrument and the date, and compare with the design or local requirement. Use calibrated instruments, follow their manuals, and leave live tests to competent persons.

Figure 5. A dedicated digital earth resistance tester. The selector offers 3-pole and 4-pole measurements and clamp-assisted modes, and the terminals marked E/C1, ES/P1, S/P2 and H/C2 connect to the electrode under test and to the temporary potential and current spikes. The brand name and model on the front panel have been blurred. (Photo: Powerfox, Wikimedia Commons, CC BY-SA 4.0)
Test 1: Continuity of protective and bonding conductors (dead test)
With the supply isolated, use a low-resistance ohmmeter to check continuity from the MET to the earth terminal of each socket-outlet, light point and fixed appliance, and from the MET to each bonded pipe. An open circuit or an unexpectedly high reading means a loose terminal, a broken conductor or a missing connection.
Test 2: Earth electrode resistance
A multimeter cannot measure earth electrode resistance; it needs a dedicated earth resistance tester. Two methods are common:
Fall-of-potential (3-pole) method. With the supply isolated and the electrode disconnected from the installation (for example at the test link), the tester is connected to the electrode, a temporary current spike some distance away, and a potential spike between them. It passes a test current through the soil and measures the voltage. A common practice is to place the potential spike at about 62% of the distance to the current spike, then repeat a little closer and further away. If the readings agree closely, the result is reliable; if not, move the spikes further out. Follow the tester's manual for spacing.
Clamp (stakeless) method. A special clamp meter induces a test voltage and measures the current around a loop. It only works where the electrode has other parallel earth paths (for example a multiply earthed network). On a single rod that is the only earth of a TT house there is no loop, so use the fall-of-potential method.
Earth resistance changes with the seasons: a rainy-season reading may rise noticeably in the dry season, so leave a margin and record the soil conditions.
Test 3: Earth fault loop impedance
With the supply connected, a loop impedance tester measures the impedance of the fault path from the line conductor, through the protective conductor and earth, and back to the source. In a TT house the result is dominated by your electrode resistance plus the supply's earth. It confirms the whole path is connected. Use a mode designed not to trip the RCD, as the instrument manual describes.
Test 4: RCD operation
Use an RCD tester to measure the trip time at the RCD's rated residual current (and at other test currents if your procedure requires), and check that it is within the manufacturer's and local requirements. Then press the RCD's own test button and show the owner how often to use it, as the manufacturer recommends. The button only checks the mechanism; it does not prove the earth is good.
Common mistakes to avoid
Using the neutral as an earth. Linking N to PE at a socket-outlet or appliance, or using the neutral terminal as the earth, puts dangerous voltage on metal parts whenever the neutral is disturbed. Never do it.
Relying on a water pipe as the only earth. A repair with a plastic section can remove the earth without anyone noticing. Bond metal pipes where required, but do not use them as the electrode.
Sharing or separating lightning protection earth without a design. The connection or separation between a lightning protection earth and the electrical earth is a design decision. Follow the lightning protection designer and local rules; do not tie them together, or keep them apart, on your own initiative.
No RCD on a TT installation, leaving no reliable disconnection for earth faults.
A short rod in dry fill or rubble, with no test result to prove it works.
Poor joints: hose clips, twisted wires, unsuitable metals, clamps buried in concrete.
An undersized or unprotected earthing conductor lying where a hoe or trimmer can cut it.
Disconnecting the main earth with the supply on "just for a quick test".
Safety checklist
Before you leave the job, confirm:
Earthing arrangement confirmed with the design or supply authority.
Supply isolated, locked off and proved dead before work at the MET.
Buried services checked; first part of the hole dug by hand.
Rod driven vertically to full depth, clear of foundations and services.
Suitable clamp, tight, corrosion-protected, accessible in a pit and labelled.
Earthing conductor sized to the design, protected, short and direct.
Protective and bonding conductors connected and labelled at the MET; no neutral-earth link in a TT installation.
Continuity, electrode resistance, loop impedance and RCD tests done and recorded.
Test link closed and covers refitted before the supply is restored.
When to call a licensed electrician or the supply authority
Trainees always work under supervision. Involve a licensed electrician, the designer or the supply authority when:
The earthing arrangement is unclear, or the supply may provide an earth terminal or a PEN conductor.
The work involves the meter, the service cable or other supply authority equipment.
The building has, or needs, lightning protection.
The resistance stays above the requirement after adding rods, or readings are unstable.
You find burning or corrosion at the MET, a missing earth, or metal parts that give a shock.
The building has solar PV, a generator or an EV charger, which may change the earthing requirements.
Frequently Asked Questions
Is an RCD enough without an earth?
No. Without an earth, the RCD trips only when current flows through a person, after the shock has begun. With a proper earth, a fault on a metal case trips the RCD before anyone touches it. The two work together.
What earth resistance value should a house have?
There is no single number. It depends on the earthing system, the protective devices, local regulations and the supply authority, and lightning protection often has its own target. Many house specifications ask for a few ohms to a few tens of ohms (for reference only). Use the value in the design or local rules, with a margin for the dry season.
Can I use a multimeter to measure earth resistance?
No. A multimeter measures resistance between its two probes; it cannot measure the resistance between an electrode and the general mass of the earth. You need a dedicated earth resistance tester with test spikes, or a suitable clamp tester where there is a parallel earth loop.
How often should the earth be tested?
At installation, after any work that affects the earthing, and periodically after that as part of routine inspection. A dry-season test shows the worst case. Follow any interval set by local rules or the designer.
Practice Exercises
Exercise 1: Identify the system. A house receives only two conductors from the supply (line and neutral) and has a single earth rod in the garden. Which earthing system does this most likely represent, what device must provide disconnection for earth faults, and what would you check with the supply authority before you start?
Exercise 2: Plan the location. Sketch a house plot with a water main, a septic tank, a driveway and the distribution board. Mark where you would drive the rod and explain why, including how you would check for buried services.
Exercise 3: Interpret test readings. Using the fall-of-potential method, you get readings at three potential spike positions that differ widely from each other. What does this tell you, and what would you change before testing again?
Exercise 4: Spot the faults. At an old house you find the earthing conductor taped around a water pipe, the rod clamp buried under concrete, and a neutral-earth link in the distribution board. List each problem, why it is dangerous, and the correct fix.