"Can you install an evacuated-tube solar water heater on our roof?" The unit looks simple: a horizontal tank, a row of glass tubes and a frame. But a poor installation has serious consequences: the frame blows over in a storm, tubes shatter because cold water is fed in while they are hot, the tank bulges or leaks because it is connected to a pressurised supply, hot water flows back into the cold tank, or taps deliver water hot enough to scald.
By the end of this lesson, you will be able to choose the position and anchor the unit on the roof, tell a non-pressurised unit from a pressurised one, connect the cold feed, hot outlet, non-return valve and vent pipe in the right places, combine it with an electric water heater, insert the tubes and fill with water at the right time, test for leaks, hand over to the client and carry out maintenance.
For installing the rooftop tank, pump and electric water heater, see the lesson Installing a pump, rooftop water tank and water heater for a town house. For running pipework and pressure testing inside the house, see Installing hot and cold water supply pipes and pressure testing before plastering.
Understand the unit before installing: non-pressurised or pressurised?
A household unit usually consists of an insulated storage tank, a row of evacuated glass tubes inserted into the tank, a support frame and the connections: cold feed, hot outlet, vent and bottom drain; many units also have a port for an electric backup heating element.
Principle: the water in the tubes heats up, becomes lighter and rises into the tank by itself, while the cooler water in the tank sinks into the tubes. This natural circulation (convection, thermosiphon) needs no pump, so the tank must be higher than the tubes and the water path must have no air pockets.
The most important thing is to know which type the unit is:
Non-pressurised unit (the type common on town houses): water goes straight into the glass tubes, the tank has a vent pipe open to the atmosphere, and the feed water comes by gravity from the rooftop tank. This type must not be connected directly to pressurised mains water or to the outlet of a booster pump: pressure above the design limit can make the tank bulge, joints leak and push tubes out of their seals.
Pressurised unit: usually uses heat pipes, has a heat exchanger in the tank, or comes with a pressure-reducing device. This type can be connected to a pressurised supply within the limits stated by the manufacturer, usually together with a safety valve.
Identify the type from the label on the tank and the catalogue (working pressure, connection diagram); if there is no documentation, ask the manufacturer — do not guess from its appearance. This lesson describes the non-pressurised type fed from a rooftop tank; for pressurised units, follow the manufacturer’s diagram.

Safety before you start
Working on the roof. Only go up when it is dry, with no rain and no thunderstorms. On roofs without railings, when working near the edge, and on tiled or metal sheet roofs: wear a full-body harness clipped to a solid anchor point (column, beam), never to a water pipe or the unit’s frame. Do not step on sheets or tiles except over the purlins.
Haul materials up to the roof with a rope held by someone, and keep people out of the area below; do not carry the tank up a leaning ladder.
Glass tubes break into sharp shards: wear cut-resistant gloves and safety glasses when handling tubes; keep the box of tubes lying flat in the shade.
Burns. Tubes, fittings and water in a unit that has been in the sun can be very hot.
Electricity. Drills, sockets and backup heating elements used outdoors must be protected by a residual current device (RCD/RCBO). Electrical connection of the backup element is handed over to the electrician.
Heatstroke. Do the main work early in the morning and late in the afternoon, which is also the right time to insert the tubes and fill with water.
Tools and materials
Full-body harness, helmet, cut-resistant gloves, safety glasses, non-slip shoes.
Concrete drill, expansion bolts or steel anchors matching the frame foot holes, spanners, spirit level, compass (or a compass app).
PPR fusion welding kit, pipes and fittings rated for hot water according to the pipe manufacturer’s catalogue, shut-off valves, non-return valve, unions, PTFE tape.
Pipe insulation and UV-protective wrapping tape; waterproofing material for the drill holes; a tarpaulin to cover the tubes.
Reference table: number of tubes, capacity and number of users
This table is only for guidance when advising clients. The actual capacity depends on the tube diameter and length and the tank design; always take the figures from the catalogue of the exact model.
Number of users (reference) | Typical capacity (reference) | Typical number of tubes (reference) | Weight of water when full (1 litre ≈ 1 kg) |
|---|---|---|---|
1 - 2 people | about 100 - 130 litres | about 10 - 12 tubes | about 100 - 130 kg, excluding tank and frame |
3 - 4 people | about 140 - 180 litres | about 14 - 18 tubes | about 140 - 180 kg, excluding tank and frame |
5 - 6 people | about 200 - 250 litres | about 20 - 24 tubes | about 200 - 250 kg, excluding tank and frame |
More than 6 people | Consider 2 units or a large unit | According to the catalogue | Must consult an engineer about the roof structure |
Ask about usage habits (bathtub, showering late at night), do not just count people.
Add the weight of the water to the weight of the tank, frame and tubes from the catalogue to know the total load on the roof.
On rainy or cloudy days the unit heats little or not at all, so many households keep an electric water heater or fit a backup heating element.
Step 1: Survey the roof and agree with the client
Position, orientation and shading
Orientation: Vietnam is in the northern hemisphere and the sun is to the south for most of the year, so the face of the tube row usually points south or close to south (for reference; follow the manufacturer’s instructions). If the roof does not allow it, choose the orientation with the smallest deviation and tell the client clearly that efficiency will be lower.
Tilt angle: use the angle of the manufacturer’s frame. Never lower the tank yourself to level with or below the top of the tubes, or the water will not circulate naturally.
Shading: the rooftop tank, the stairwell head-house, a neighbour’s wall or trees can all cast shade for part of the day. Ask the client whether the neighbours plan to add more floors.
Close to the point of use so hot water reaches the taps quickly; leave a safe standing area for maintenance.
Agree with the client before drilling: position, pipe route, whether to keep the electric heater or fit a backup element, the schedule for inserting the tubes, and work outside the scope (structural strengthening, old waterproofing, electrical wiring).
Load and wind anchoring
A full unit can weigh several hundred kg concentrated on a few small feet. Therefore:
Flat concrete roofs: place the frame feet close to beams, columns or load-bearing walls. If the roof slab is cracked, sagging or has leaked for years, or the head-house is a later addition: advise the client to consult a structural engineer. A plumber does not decide alone that the roof can take the load.
Metal sheet and tiled roofs: do not rest the unit on the sheets or tiles; it needs a support frame bearing on the purlins, rafters or beams, and waterproofing at every roof penetration.
Do not prop it up with loose bricks. If the feet need raising, use concrete plinths with anchor bolts.
The tube row and tank catch a lot of wind. Bolt down every frame foot hole and fit all bracing bars or cables if the manufacturer supplies them. If you drill through the waterproofing layer, seal around the bolts, otherwise in a few months the ceiling of the floor below will leak.

Real-life example
In a 4-storey town house, the client wants the unit right at the front edge of the roof "because it looks nice". The survey shows that spot is a cantilevered slab and is shaded by the stairwell head-house in the afternoon. The plumber suggests moving the unit to the middle of the roof, with the frame feet on the beam lines, away from the shade of the head-house and the rooftop tank. The load sits on the load-bearing structure and the pipe run is shorter; the client agrees once it is explained.
Step 2: Assemble the frame and place the tank
Assemble the frame according to the manufacturer’s drawing and tighten the bolts just enough.
Set the frame in position, adjust the orientation with the compass, and use a spirit level to check that the frame is not twisted and not tilted sideways (a tilted tank makes air collect at one end and the water circulates poorly).
Drill, fit the anchor bolts and tighten everything; seal the drill points against water.
Place and secure the tank on the frame, with the tube holes facing the right way.
Do not insert the tubes yet if the sun is out: empty tubes in the sun heat up very quickly.
Step 3: The cold feed from the rooftop tank
Height: the bottom of the rooftop tank must be higher than the solar tank as required by the installation instructions of the exact model (some manufacturers state a minimum height difference). Do not make up a figure. If the rooftop tank is lower than the solar tank, the unit will not fill: raise the tank or use a solution the manufacturer allows.
Do not tee off directly from the mains or after a booster pump. If you are not sure whether the tee point is before or after the pump, run a dedicated pipe from the rooftop tank.
A shut-off valve near the tank so that maintenance does not require draining the whole rooftop tank.
A non-return valve on the cold feed, with the arrow in the correct direction (from the rooftop tank towards the solar tank), placed after the shut-off valve in an accessible spot. Without the valve, expanding hot water and convection can flow back into the cold pipe and rooftop tank: cold taps give warm water and the cold feed pipe gets hot. Some manufacturers have their own diagram or an anti-backflow device inside the tank: follow the manufacturer.
Once backflow is blocked, the expanding water must have a way out. For a non-pressurised unit, that is the vent pipe, which is why the vent pipe must never be blocked.
Step 4: Hot outlet, vent pipe and bottom drain
Hot water outlet pipe
Pipes and fittings rated for hot water according to the catalogue. For the welding technique, see the lesson Welding PPR pipe correctly.
Insulate the entire hot pipe run; on outdoor sections add UV-protective tape or a protective sleeve, because sunlight makes foam insulation brittle and it peels off.
Keep pipe runs short with few bends, and avoid up-and-down sections that form air pockets; at local high points, provide air release according to the manufacturer’s instructions.
Hot water pressure at the taps depends on the height difference from the rooftop tank to the tap; bathrooms just under the roof are usually weak. Tell the client in advance rather than promising "as strong as the cold water".
Vent pipe and bottom drain valve
The vent pipe keeps the tank unpressurised: no valve, no plug, no connection to other pipes.
The top of the vent pipe usually has to be higher than the highest water level in the rooftop tank, otherwise water will overflow continuously by the principle of communicating vessels. Check the manufacturer’s specific requirements.
The outlet faces downwards or has a cap against rain and insects.
If the tank has a bottom drain, fit a drain valve and run the outlet to a safe drainage point.
Step 5: Insert the evacuated tubes — not in strong sun
This is the step where tubes are broken most often.
Timing: early morning, late afternoon or overcast weather. If you have to work in sunshine, cover the whole tube row with a tarpaulin until it is completely filled with water.
Why: evacuated tubes retain heat extremely well; an empty tube in the sun can get so hot that contact with cold water causes thermal shock and cracking. If the tubes have been in the sun while empty, do not fill them straight away: cover them and wait until they are completely cool (usually until evening or the next morning).
Check the tubes before inserting them: no cracks and no chipped mouths. If the silvered coating at the closed end of a tube has turned milky white, that is usually a sign the tube has lost its vacuum (indicative sign); such a tube should be exchanged.
Inserting the tubes: fit the seal in the manufacturer’s way (if the manufacturer allows it, apply a little soapy water), align the tube on the axis, and push while twisting gently to the depth specified by the manufacturer. Do not force it off-axis.
Seat the lower end of each tube in the support rail with its end cap and tighten the clamp by hand. When finished, the tubes must be parallel; a misaligned tube is usually caused by a folded seal.

Step 6: Fill with water, bleed air and test for leaks
Check: the bottom drain valve is closed, the vent pipe is clear and the non-return valve faces the right way.
Open the cold feed valve slowly; open a hot tap on an upper floor to let air out.
Watch for the full signal in the manufacturer’s way (overflow pipe, level indicator, etc.). When the hot tap runs smoothly with no more air spitting, close it; open each of the other hot taps in turn to bleed air from each branch.
Do not use a pressure test pump on a non-pressurised tank. When pressure testing the hot and cold pipework in the house, close the isolation valve so the tank is not subjected to the test pressure, because the test pressure for pipework can far exceed what the tank can withstand. The unit itself is leak-tested under working conditions (water from the rooftop tank):
Wipe the joints and tube seals dry; check again for wet marks after a few hours.
Check again at the end of the first sunny day, when the hot water expands and threaded joints are more likely to seep.
After the first rain, inspect the ceiling of the floor below at the anchor drilling points.
Step 7: Combining with an electric water heater and backup element
Connecting to an existing electric water heater
In series: hot water from the solar unit goes into the cold inlet of the electric heater; on sunny days the electric heater has little heating to do, and on overcast days it tops up. Check that the electric heater manufacturer allows high-temperature water at the inlet; keep the electric heater’s safety valve in place.
In parallel with selector valves: arrange valves to choose whether hot water comes from the solar unit or from the electric heater; label the valves clearly.
On very sunny days, water from the solar unit can be much hotter than the temperature set on the electric heater, because the unit has no thermostat; the electric heater’s thermostat only stops further heating, it does not cool the water down. In homes with small children or elderly people: recommend a thermostatic mixing valve at the outlet, or at least advise the habit of turning on the cold water first and then gradually adding hot.
If the electric heater is leaking or its safety valve is discharging continuously, deal with that first; see the lesson Water heater leaking, safety valve dripping continuously or no hot water.
Electric backup heating element
The plumber fits the element in the correct port with the correct seal, watertight. The electrical work is handed over to the electrician, at minimum: a dedicated cable and circuit breaker with residual current protection (RCD/RCBO), earthing according to the manufacturer’s instructions, weatherproof outdoor junction box and switch, and cable run in UV-resistant conduit. Do not switch on the element before the tank is full (dry firing quickly destroys it). See also the lesson Wiring a water heater safely against electric shock.

Handover to the client
Show the location of the cold feed valve, the bottom drain valve, the hot source selector valve and the backup element’s circuit breaker; label them.
Explain: on sunny days the water is hottest in the late afternoon and evening; after several overcast days it may only be warm; on very sunny days the water is very hot and cold water must be mixed in first.
Advise: if the rooftop tank runs dry (water outage, pump failure) on a sunny day, when the water comes back wait until evening before opening the feed valve to the unit, to avoid cold water entering hot tubes.
Record the model, number of tubes and installation date for warranty purposes.
Maintenance and replacing broken tubes
Flush out sediment through the bottom drain valve until the water runs clear; frequency according to the manufacturer’s instructions and water quality. If the rooftop tank has a lot of sediment, flush it at the same time; see the lesson Cleaning and flushing rooftop water tanks and underground tanks.
Clean the tubes when they are cool; never spray cold water on hot tubes.
Inspect the seals, insulation, frame rust, anchor bolts and whether the vent pipe is blocked; if the tank has a corrosion protection rod (magnesium rod), replace it as the manufacturer specifies.
Replacing a broken tube: do it when the tubes are cool, wearing cut-resistant gloves and safety glasses. Close the feed valve and open the bottom drain to lower the water in the tank below the tube holes (the tubes enter from the underside of the tank, so you usually have to drain almost all of it; the drained water may be hot). Remove the clamp, pick up all the broken pieces, fit a new seal, insert the new tube as in Step 5, refill when the sun is not strong and check for seepage. A broken tube lets water run out through its hole: close the feed valve and arrange a replacement soon.
Safety and quality checklist
☐ Identified the unit type (pressurised or not) from the label or catalogue.
☐ Dry weather, no storms; full-body harness clipped to a solid anchor; a helper to haul materials.
☐ Frame feet placed on load-bearing points; if in doubt, advised consulting a structural engineer.
☐ All wind anchor bolts fitted; drill points sealed against water.
☐ Non-pressurised unit fed from the rooftop tank, not teed off the mains or after a booster pump.
☐ Shut-off valve and non-return valve facing the right way (or as per the manufacturer’s diagram).
☐ Vent pipe clear, with no valve and no plug.
☐ Tubes inserted and filled when the sun is not strong; cut-resistant gloves and glasses worn when handling tubes.
☐ Tank isolated during the pressure test of the house pipework.
☐ Hot pipes insulated and protected from UV.
☐ Backup element wired by the electrician, with RCD/RCBO and earthing; not switched on before the tank is full.
☐ Warned the client about scalding risk and recommended a thermostatic mixing valve if needed.
Frequently asked questions
Can it be installed in a house that uses mains water directly, without a rooftop tank?
A non-pressurised unit must not be connected directly to the mains. Either install a rooftop tank to feed it by gravity, or choose a pressurised unit (or one with a pressure-reducing device) that the manufacturer allows to be connected to a pressurised supply, with a safety valve as per the manufacturer’s diagram.
Is it a problem to leave out the non-return valve?
Without the valve, clients typically complain that cold taps give warm water and the cold feed pipe gets hot, because hot water flows back into the rooftop tank. If the unit has its own anti-backflow device, follow the manufacturer.
Can a booster pump be fitted on the hot water line?
Only if the unit’s manufacturer allows it, in the position the manufacturer specifies, using a pump rated for hot water, and without letting the pump’s discharge pressurise a non-pressurised tank. For how pumps work, see the lesson Booster pump running continuously or cycling on and off.
Practice exercises
Reading a catalogue: get the documentation for two evacuated-tube models. Record: pressurised or not, capacity, number of tubes, empty weight, required rooftop tank height difference, position of the non-return valve. Calculate the total load when full.
Draw a connection diagram for a town house with a rooftop tank, a booster pump and an electric water heater in the 3rd-floor bathroom: cold feed, hot outlet, vent pipe, shut-off valve, non-return valve and the connection point to the electric heater. Mark where water for the unit must not be taken from.
Practise with glass tubes under an instructor’s supervision: wearing gloves and glasses, practise fitting seals and inserting and removing old tubes in a training tank, checking that the tubes are parallel and the seals are not folded.
Role play: the homeowner asks you to "install it at noon so it’s done and we can shower this afternoon". Explain the risk of thermal shock to the tubes and propose a sensible work schedule.