In Level 1 you learned that the green-and-yellow earth conductor connects to the third hole of a socket outlet and to the metal casing of appliances. But where does that conductor actually go? Down to the house's own earth rod, or back to the utility's neutral conductor? What earth rod resistance is good enough? The answer depends on the earthing system of the installation, and choosing the wrong system or making a bad connection can turn the earth conductor itself into a source of danger. This lesson explains the two systems most common in Vietnamese homes, TT and TN-C-S, how to install earth rods, and how to measure earth resistance using the correct method.
By the end of this lesson, you will be able to:
- Read the earthing system designations TN-C, TN-S, TN-C-S, TT and IT according to TCVN 7447 (the Vietnamese adoption of IEC 60364-1).
- Identify the earthing system of a real house and understand what it means for RCD selection.
- Install an earth rod system: choosing rods, spacing them, making connections and building an inspection pit.
- Measure earth resistance using the 3-pole (fall-of-potential) method and using an earth clamp meter.
- Carry out main equipotential bonding of metal water pipes and metal frames.
The two letters of an earthing system
The designation is made up of two (or three) letters:
- First letter – how the source (the transformer neutral point) relates to earth: T (from the French "Terre") = directly earthed; I = isolated from earth or earthed through a high impedance.
- Second letter – how the exposed metal parts of equipment relate to earth: T = equipment casings earthed locally, independently of the source; N = casings connected back to the source neutral point through a conductor.
- Letter after the dash (for TN systems): C = the N and PE functions are combined in a single conductor (PEN); S = N and PE are separate conductors.
The TT system: common in Vietnamese homes
The utility's low-voltage network has its neutral earthed at the transformer substation and re-earthed at points along the line. A typical house receives 2 conductors (L and N). The metal casings of equipment inside the house are connected to the house's own earth rod, not to the network's N conductor. This is the TT system.
A key characteristic: when a live conductor touches an equipment casing, the fault current flows from the casing → PE conductor → house earth rod → the ground → the substation earth electrode → back to the source neutral. The return path through the ground has a high resistance (a few tens of ohms at the house rod plus the substation electrode), so the fault current is only a few amps. Example: 220V / (30Ω + 4Ω) ≈ 6.5A. A C16 circuit breaker will not trip on that current. Meanwhile the casing carries a dangerous voltage: 6.5A × 30Ω ≈ 195V.
Warning: In a TT system, an MCB will almost never trip by itself on a fault to the casing. An RCD is mandatory for protection against indirect contact. The condition from IEC 60364-4-41 is RA × IΔn ≤ 50V, where RA is the total resistance of the earth electrode and the PE conductor. With a 30 mA RCD, RA ≤ 50 / 0.03 ≈ 1667Ω – easy to achieve; but the better the earth rod, the less dangerous the casing voltage and the more reliably the RCD trips.
The TN-C-S system: apartment blocks and buildings with their own substation
From the building's own transformer substation, a PEN conductor (combined N and PE) runs to the main switchboard, and from there it is split into separate N and PE conductors all the way to each apartment. From the split point onwards, N and PE must never be connected together again.
Advantages: the fault current from a live-to-casing fault returns to the source through metal conductors, the impedance is low, the fault current reaches hundreds of amps, and the MCB trips quickly. Disadvantages: if the PEN conductor breaks upstream of the split point, equipment casings can rise to a dangerous voltage. For that reason the PEN conductor must be large enough, must be re-earthed at intervals, and must never pass through a switching device.
| Criterion | TT | TN-C-S |
|---|---|---|
| Equipment casings connected to | The house's own earth rod | The source neutral via the PE conductor |
| Fault current to casing | Small (a few amps) | Large (hundreds of amps) |
| Device that clears a casing fault | RCD mandatory | MCB can trip; RCD as additional protection for sockets |
| Main risk | Earth rod deteriorating | Broken PEN conductor |
| Typically found in | Town houses and garden houses supplied from the public network | Apartment blocks, buildings with their own substation |
Never take it upon yourself to connect the house PE conductor to the utility's N conductor to "create a TN-C-S system". That is a decision for the power supplier and the designer, and it requires a reliable PEN conductor with repeated earthing. An electrician who does this on a whim can put voltage from the network neutral onto the casing of every appliance in the house whenever the network neutral has a fault.
Installing an earth rod system for a house
Photo: Không rõ tác giả / Wikimedia Commons, CC BY-SA 3.0
TCVN 9385:2012 (lightning protection for buildings) and TCVN 4756 (earthing and neutralising of electrical equipment) give guidance on earthing. Common practice for houses:
- Rods: copper-bonded steel, 14–16 mm in diameter and 2.4 m long; or hot-dip galvanised steel. Avoid ordinary mild steel (it rusts quickly).
- Number of rods: 1–3 rods depending on the soil; space them at least one rod length apart (roughly 2.4–5 m) so that their current dispersion zones do not overlap.
- Depth: the rod head sits 0.5–0.8 m below ground level, inside a pit with an inspection cover.
- Rod interconnection: bare copper cable or copper tape buried in the ground, joined by exothermic welding or purpose-made clamps – never just by twisting wires together.
- PE conductor from the rod to the board: green-and-yellow insulated copper, typically 10–16 mm² for a house, connected to the main earthing bar in the board.
- Dry or rocky soil: use a ground enhancement material (GEM) to lower soil resistance, following the manufacturer's instructions, or increase the number of rods.
Photo: Asurnipal / Wikimedia Commons, CC BY-SA 4.0
Main equipotential bonding
Metal water pipes, metal gas pipes, steel frames and metal structural parts entering the house must be connected to the main earthing terminal with equipotential bonding conductors (typically 6–10 mm² copper, according to IEC 60364-5-54). The purpose: when a fault occurs, all metal parts that a person could touch at the same time are at the same potential, so there is no dangerous voltage difference between, say, a water tap and the casing of a washing machine. Bathrooms may also need supplementary equipotential bonding according to IEC 60364-7-701 where the design requires it.
Measuring earth resistance
The 3-pole method (fall of potential, 62%)
This is the standard method, using an earth resistance tester (earth tester) with 3 terminals: E, P and C.
- Disconnect the PE conductor from the rod under test (or remove the test link in the inspection pit) so you are not measuring in parallel with other systems. Do this with the supply switched off or under otherwise safe conditions.
- Connect terminal E to the rod under test.
- Drive the auxiliary spike C about 20–40 m from E (the further away, the more accurate the result for large electrode systems).
- Drive the auxiliary spike P on the straight line between E and C, at about 62% of the E–C distance from E.
- Take the measurement and record it. Move spike P by ±10% of the distance (closer and further away) and measure again. If the three values are close to each other (less than about 5% apart), the result is reliable.
- Reconnect the PE conductor, tighten it, and fill in the test record: date, weather, soil moisture and the measured value.
Photo: Powerfox / Wikimedia Commons, CC BY-SA 4.0
Earth resistance clamp meter
You simply clamp it around the rod conductor without disconnecting anything and without auxiliary spikes. It is fast and convenient, but it only gives a correct reading when the rod is part of a loop with many earthing points in parallel (for example the repeated earthing points of a distribution network). On a single rod of a house with a TT system, an earth clamp meter usually does not give a correct result. Use it for quick checks; it does not replace the 3-pole method for a formal test record.
What value counts as a pass?
The safety condition with an RCD is RA × IΔn ≤ 50V. In practice, designers usually set a much lower target: a protective earthing system for a house is often designed for ≤ 10Ω or whatever the design specifies, and lightning protection earthing under TCVN 9385:2012 is recommended to be ≤ 10Ω. Many projects combine the protective earthing and lightning protection earthing systems according to the design. Always write the measured value and the acceptance criterion applied in the test record.
Identifying the earthing system of an existing house
Before repairing or extending an installation, the journeyman must know which earthing system the house uses. On-site inspection procedure:
- Ask and check the documents: apartment blocks usually have floor board drawings that clearly state TN-S or TN-C-S. Self-built town houses usually have no documentation.
- Open the main board (with the power off): find the earthing bar and see where the PE conductor comes from. If the PE conductor goes down through the wall into an inspection pit, it is most likely TT. If the PE conductor runs back to the floor board or building board together with the supply cables, it may be TN.
- Check for an N–PE link inside the apartment board: inside an apartment, N and PE must be separate. If you find a link between the N bar and the PE bar in the apartment board, it is a fault that must be reported (unless the design documents clearly state that this is the split point).
- Measure the L–PE earth fault loop impedance with a multifunction installation tester (see the commissioning lesson): a value below 1–2Ω suggests a TN system, while a value of tens of ohms suggests a TT system.
- Record it on the survey sheet: earthing system, rod location, measured values and the condition of the connections.
Knowing the system helps you make the right decisions: a TT house with no RCD is the top-priority issue to fix; a TN-C-S house needs a careful check of the PEN conductor and the split point; a house with no earth rod at all needs advice on installing a new earthing system.
Maintaining the earthing system
Every year (or as set out in the maintenance contract), open the inspection pit: check whether the connections are corroded or loose, and whether the conductor has been cut by digging or gardening; re-measure the resistance in the dry season and compare it with the previous reading. A clear increase in resistance is a sign that the rod is corroding or a connection has failed.
Common mistakes
| Mistake | Consequence | Correct practice |
|---|---|---|
| Connecting PE to N in a socket or board (TT system) | Casings become live when N breaks; the RCD trips constantly | Keep PE and N completely separate |
| Using a water pipe as the earth electrode | Plastic pipe sections break the circuit; metal pipes rust | Use purpose-made rods; water pipes are only for equipotential bonding |
| Measuring earth resistance without disconnecting PE | A falsely low result | Remove the test link in the inspection pit |
| Rods placed too close together | Total resistance drops very little | Spacing ≥ one rod length |
| Rod connection made by twisting wire, unprotected | Corrodes and breaks after a few years | Purpose-made clamp or exothermic weld, with an inspection pit |
Pass criteria for this lesson
- Correctly identify the earthing system of 3 real installations (a town house, an apartment, a small workshop) and explain what it means for RCDs.
- Calculate the casing voltage during a live-to-casing fault in a TT system for a given earth rod resistance.
- Install 2 earth rods with correct spacing, connections and an inspection pit in the practical exercise.
- Measure earth resistance by the 3-pole method, with 3 readings taken while moving spike P, deviation ≤ 5%.
- Complete an earth test record with all the required information.
Frequently asked questions
The house has no earth rod. Does it need one?
Yes, it should have one. Without PE, an appliance with leaking insulation keeps its casing live until someone touches it; the RCD only trips once the current is already flowing through that person. With a PE conductor and an earth rod, the RCD trips as soon as the leakage starts.
Does earth resistance change with the seasons?
Yes. Resistance is higher in the dry season than in the rainy season, sometimes several times higher. Measure in the dry season to get the worst-case value, or record the test conditions in the test record.
Can the lightning protection earth and the protective earth share the same rods?
Modern standards generally recommend bonding the earthing systems together to avoid dangerous potential differences during a lightning strike, but how they are bonded must follow the design. Level 3 has a dedicated lesson on lightning protection.
Further reading
See the earthing sections in Installing a distribution board with MCBs, RCBOs and earthing and Installing two-way switches and earthed socket outlets.