In Vietnam, the number of homes that already have electricity is many times greater than the number of homes being built. A great many houses that are 15–30 years old still use flexible twin cable run on the surface, porcelain-box knife switches, no earth conductor, two-pin sockets, and kitchen circuits shared with lighting circuits. Meanwhile, household loads have grown three or four times: air conditioners in every room, water heaters, induction hobs, dryers, and in some homes even electric vehicle chargers. This is the root cause of most electrical fires in homes – and it is also the largest and most stable service market for a highly skilled electrician.
An ordinary electrician is called out after something fails and repairs exactly what broke. A master electrician is invited before anything fails: they assess the whole system, rank the risks, propose options to fit the budget, and then set up a periodic maintenance contract. This lesson teaches you to do that systematically, with measurements, and with a report the homeowner can understand.
By the end of this lesson, you will be able to:
- Carry out an assessment survey of an older electrical installation using a 6-step procedure without missing anything.
- Recognize the common danger signs in older homes and classify them into 3 risk levels.
- Safely test an occupied installation: insulation, PE continuity, earthing, RCDs, phase balance.
- Use a thermal camera to find poor connections, and understand its limitations.
- Write an assessment report with photos, readings, risk levels and 3 upgrade options to fit different budgets.
- Design a periodic maintenance package with clear intervals and task lists.
Why do electrical installations deteriorate?
Electrical systems do not fail suddenly. They deteriorate gradually through four mechanisms, and understanding them tells you where to look:
- Heat: every connection has a small contact resistance. Under heavy load the joint heats up and expands; when the load is switched off it cools and contracts. After thousands of cycles the screw gradually loosens, the contact resistance rises and the joint gets even hotter – a spiral that ends in fire. The heat produced at the contact is P = I² × R: with a current of 20 A and a contact resistance of only 0.05 Ω, the joint dissipates 20 W – the equivalent of a small soldering iron sitting inside a plastic box.
- Insulation ageing: PVC sheathing loses its plasticizers over time, especially when hot; it becomes hard, brittle and cracked. Cables run under metal-sheet roofs, close to halogen lamps, or in west-facing walls deteriorate fastest.
- Moisture and corrosion: leaking roofs, junction boxes at the base of walls, outdoor sockets, houses near the sea. Copper oxidizes into a green layer and aluminium into a white layer, increasing contact resistance and reducing insulation.
- Human interference: repeated alterations by many different electricians, joints made without junction boxes, wrong cable sizes, cables drilled through, rodent damage. This is often the biggest cause in older townhouses.
When loads increase but the system is not upgraded, all four mechanisms accelerate. A 1.5 mm² cable in conduit buried in a wall was designed for a lighting circuit; when the homeowner plugs a 2 kW kettle into the "handy" socket on that circuit, the cable is overloaded every single day.
The 6-step assessment procedure
Step 1. Interview the homeowner (15 minutes)
Before you open any cover, ask questions. The homeowner knows things that no meter can tell you:
- When was the house built, how many times has the wiring been altered, by whom, are there any drawings?
- Which breaker trips often, and when (when the water heater is switched on, when it rains, in the evening)?
- Are any sockets or switches hot, smelling of burning, or do lights flicker when a large appliance starts?
- Has anyone felt a tingle when touching the washing machine casing, the shower or the fridge?
- What equipment is planned: air conditioners, induction hob, EV charger, solar PV?
- Budget and expectations: just make it safe, or redo it properly and neatly?
Write the answers down word for word. A remark like "sometimes I feel a tingle at the shower" is a level 1 safety clue and must be checked during the same survey visit.
Step 2. Visual survey (30–60 minutes)
Follow the flow of current: from the meter, through the meter tails, to the main board, the floor boards, and then each room. Open the board covers (after checking that the enclosure is not live), look carefully and photograph everything. A minimum visual inspection checklist:
| Area | What to check |
|---|---|
| Meter and meter tails | Cable size after the meter compared with the main breaker; joints; whether the cable is pulled tight or rubbing against sheet-metal edges |
| Main board / floor boards | Type of device (knife switch, fuse, MCB, RCD); burn marks, discolouration; more than one conductor in a single terminal; missing screws; open holes without blanking; whether there is a PE bar |
| Wiring in the house | Twin cable on the surface, fixed with nails, passing through walls without conduit; twisted joints wrapped in tape with no box |
| Sockets, switches | Cracked or scorched faceplates, loose from the wall; two-pin sockets in wet areas; sockets below taps |
| Wet areas | Whether the water heater has an earth conductor; switches inside the bathroom; sockets next to the sink |
| Ceilings, roof space | Cable above plasterboard ceilings without conduit; cable close to halogen lamps; rodents; leaks |
| Large appliances | Whether the air conditioner, cooker and pump have dedicated circuits; whether the supply cable is adequately sized |
Photo: Ser Amantio di Nicolao / Wikimedia Commons, CC BY-SA 4.0
Step 3. De-energized testing
Because the house is occupied, you must agree a power-off window in advance (usually 1–2 hours), and ask the homeowner to unplug sensitive electronics and shut down computers and the fridge. Apply the full isolate – lock – tag – test procedure as you learned at Level 1. The tests:
- Insulation resistance of each circuit: test between (L and N joined together) and PE at 500 V DC. Older houses often have no PE, so test between L and N (after disconnecting all loads and lamps) and between L/N and metal casings or earth. Record the actual value, not just "pass".
- PE conductor continuity (if present) from the PE bar to each socket, the water heater casing and the washing machine casing.
- Earth resistance if there is an earth rod: three-rod method or an earth clamp meter.
- Terminal tightness check in the boards with a torque screwdriver, or at the very least by hand with a careful feel.
Reference limits for assessing the insulation resistance of an installation in service:
| Result at 500 V DC | Assessment | Action |
|---|---|---|
| > 50 MΩ | Good | Record as a reference value |
| 2–50 MΩ | Acceptable, shows signs of ageing or moisture | Monitor, re-test at the next maintenance visit |
| 1–2 MΩ | Concerning | Split the circuit to locate the weak section; include it in the replacement plan |
| < 1 MΩ | Fail | Locate and fix before re-energizing; if it cannot be found, isolate the circuit |
Step 4. Live testing and thermal imaging
- Voltage at the main board with no load and with a large load switched on (water heater + air conditioner). A voltage drop of more than 5–8 V when a 3 kW load is switched on indicates undersized meter tails or a poor connection.
- Current on each circuit with a clamp meter at peak time (in the evening). Compare with the breaker rating and the current-carrying capacity of the cable.
- Phase balance for a three-phase house: the difference in current between phases (covered at Level 3).
- RCD test with the T button and with a trip-time tester if you have one.
- Total leakage current: clamp a leakage clamp meter around both L and N of the circuit; a few mA is normal, more than 10 mA on one circuit means you need to find the leaking appliance.
- Thermal imaging of the boards, sockets of large appliances, and meter-tail joints – see the section below.
Thermal cameras: a powerful tool with limitations
Photo: Asurnipal / Wikimedia Commons, CC BY-SA 4.0
A thermal camera measures infrared radiation from surfaces and displays it as a colour image by temperature. In a distribution board it reveals in seconds what the naked eye cannot see: a loose screw, a breaker about to fail, an overloaded phase.
Conditions for a meaningful thermal image
- There must be load. No current, no heat. Take images when the current is at least 40% of the circuit rating; evening is best. Record the measured current at the time of the image.
- You must have a direct line of sight. The camera cannot see through board covers, walls or glass. You have to remove the cover – which means you are working near live parts: wear insulating gloves and a face shield, keep your distance and touch nothing.
- Watch emissivity. Shiny metal surfaces (new copper busbars, plated screws) reflect heat from their surroundings and read lower than their true temperature. Measure on plastic housings or cable insulation, or stick black electrical tape on metal surfaces (with the power off) to create a reliable measuring point.
- Compare, don't just read numbers. The most reliable assessment is to compare similar points carrying similar loads: the three phases of the same breaker, the two ends of the same cable.
A classification scale commonly used in electrical maintenance, based on the temperature difference ΔT between the suspect point and a similar point:
| ΔT compared with a similar point | Level | Action |
|---|---|---|
| 1–10 °C | Monitor | Record, re-check at the next maintenance visit |
| 10–20 °C | Repair needed | Plan to fix within a few weeks |
| 20–40 °C | Serious | Fix as soon as possible, reduce the load until repaired |
| > 40 °C | Emergency | Isolate the circuit, fix immediately |
An important note: low-cost thermal cameras have low resolution (80×60 pixels) and are only good enough to find hot spots at close range. They do not replace insulation testing, PE continuity testing and RCD testing. A system with a "nice" thermal image can still have no earthing at all.
Common danger signs in older homes
Photo: Phiarc / Wikimedia Commons, CC BY-SA 4.0
- Scorch marks, discolouration, deformed plastic on sockets, plugs, terminals or breakers. There is always a cause: poor contact or prolonged overload.
- "Upgraded" fuses using thick copper wire, or breakers rated higher than the cable can carry (for example 32 A on 1.5 mm² cable): overcurrent protection has been defeated.
- No RCD on socket circuits, wet areas or the water heater.
- No PE conductor, or the neutral used as the protective conductor inside the house (TN-C style) – acceptable in some very old systems but not permitted in new installations.
- Aluminium conductors joined directly to copper without a purpose-made connector: galvanic corrosion at the joint.
- Twisted joints wrapped in tape buried in walls or lying in ceilings without a junction box.
- Flexible twin cable used as fixed wiring, run on the surface and fixed with nails.
- Reversed polarity: the switch breaks the neutral instead of the line conductor – the lamp goes off but the lampholder is still live.
Photo: Dmitry G / Wikimedia Commons, CC BY-SA 3.0
Risk classification: 3 levels
The homeowner does not need every technical detail, but does need to know what must be done now and what can wait. Classify every finding into one of three levels:
| Level | Definition | Examples | Timeframe |
|---|---|---|---|
| Level 1 – Dangerous | Can cause electric shock or fire immediately | Live water heater casing; exposed live parts that can be touched; scorched terminals; insulation < 1 MΩ | Fix or isolate during the survey visit |
| Level 2 – At risk | Not immediately dangerous but missing an important layer of protection | No RCD; no PE; breaker larger than the cable can carry; joints without boxes | Fix soon, within a few weeks |
| Level 3 – Improvement recommended | Does not meet current standards, or limits usability | No circuit labels; board has no spare ways; too few sockets, leading to extension leads | Include in the upgrade plan |
Trade principle: A level 1 finding must be fixed or isolated before you leave the house, and the homeowner must be informed both verbally and in writing (a message with photos). Never leave behind a hazard you know about just because "the customer hasn't accepted the quote yet".
Writing the assessment report
The report is the product you are selling. A good report helps the homeowner make decisions and forms the basis of your quotation. Suggested structure (4–8 pages for a townhouse):
- One-page summary: overall condition (good / needs repair / dangerous), number of findings at each level, the three most important things to do.
- System information: power supply, registered capacity, earthing system, number of boards, number of circuits, existing single-line diagram (redraw it if there is none).
- Test results: a complete table of readings like a test record, with test date and instruments used.
- List of findings: one line per finding: location, description, photo, risk level, recommended action.
- Three options:
- Option A – Minimum safety: fix all level 1 items and the most important level 2 items (add RCDs, repair hot spots, replace wrongly rated breakers).
- Option B – Upgrade the board and main circuits: A + rebuild the main board, separate the large-appliance circuits, run PE conductors, install an earth rod.
- Option C – Complete rewire: rewire everything in conduit with a new design based on future needs.
- Preliminary estimate for each option (using the take-off method learned in this level), plus construction time and the level of disruption to daily life.
- Limitations of the assessment: parts that could not be inspected (cables inside walls that were not opened, inaccessible areas) and assumptions made.
The "limitations of the assessment" section is very important legally. If a problem later occurs in a section of cable inside a wall that you could not inspect, the report has already stated this clearly.
Periodic maintenance packages
After the assessment and upgrade, offer the homeowner a maintenance package. It is a steady source of income and a way to keep customers for the long term. Suggested intervals for homes:
| Interval | Who does it | Content |
|---|---|---|
| Monthly | Homeowner | Press the T button to test every RCD; check whether sockets and plugs are hot or discoloured |
| 6 months | Electrician (basic package) | Visual inspection of the boards, re-tighten heavily loaded terminals, thermal image of the boards under load, check the air-conditioner outdoor units and the water heater |
| 12 months | Electrician | As above + insulation testing of suspect circuits, RCD trip-time testing, check the surge protection devices (indicator lamps, status windows) |
| 3–5 years | Electrician (full testing) | Full testing as at acceptance, earth resistance measurement, comparison with reference values, update the documentation |
| Before the rainy and storm season | Electrician | Check lightning protection, outdoor sockets, junction boxes in places that may flood, pump control panels |
Each maintenance visit produces a sheet recording the readings and the work done, which is added to the job's as-built documentation. After a few years you have a series of data that shows trends: which circuit's insulation is slowly falling, whether earth resistance rises in the dry season. This is a professional advantage that no "call-and-fix" competitor has.
Common mistakes
| Mistake | Consequence | Correct practice |
|---|---|---|
| Surveying only what the customer points out | Missing a bigger hazard elsewhere | Always follow the 6-step procedure, from the meter to the appliances |
| Thermal imaging with no load | A falsely "clean" image, hot spots missed | Image at ≥ 40% load, record the current at the time of the image |
| Writing "pass / fail" instead of readings | Loss of reference values for next time | Record actual readings, date, temperature and instrument |
| Quoting the most expensive option straight away | The customer is scared off and does nothing – the risk remains | Three options; option A always deals with level 1 items |
| Leaving a level 1 hazard because the customer has not agreed yet | Accident; liability of the person who knew and did not warn | Isolate immediately, inform in writing with photos |
| Opening a live board without PPE to take thermal images | Arc flash, electric shock | Insulating gloves, face shield, keep your distance, touch nothing |
Pass criteria for this lesson
- Survey a sample house (or a simulated practice room) following all 6 steps within a maximum of 3 hours.
- Find at least 8 of the 10 faults planted in the practice room, and classify the correct risk level for at least 9 out of 10 faults found.
- Measure and record insulation, PE continuity and RCD trip time for every circuit, with no more than 10% deviation from the instructor's readings.
- Correctly read 5 sample thermal images: identify the hot spot, calculate ΔT and classify the action level.
- Write an assessment report with all 7 sections and 3 options with estimates, graded as passing by the instructor.
Frequently asked questions
Should I charge for an assessment survey?
Yes. A full assessment takes half a working day of a highly skilled electrician's time, plus time to write the report. Many electricians charge a survey fee and deduct it from the contract value if the customer goes ahead with the work. A survey fee also filters out customers who only want a quote for comparison.
Can I do an assessment without a thermal camera?
Yes. You can still use your hand (the back of your hand, close to but never touching live parts) and an infrared thermometer pointed at device housings. Combined with current measurements and looking for discolouration, you can still find most hot spots. A thermal camera is faster and gives you image evidence for the report.
An old house has no PE conductor – do I have to rewire everything?
Not necessarily right away. Installing 30 mA RCDs on socket circuits and wet areas is the single most important additional measure, and it can be done quickly at low cost. The next step is to run PE conductors to metal-cased appliances in wet areas (water heater, washing machine). Running PE throughout the house is usually done together with rewiring as part of a major upgrade option.
Further reading
Review how to diagnose tripping breakers in the lesson Diagnosing breakers that keep tripping, how to choose cables and breakers in the lesson Choosing cable sizes and breakers, and the safety rules in the lesson Safety rules before touching electrical wires.